My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1913/04/25 Council Minutes
>
Council Minutes
>
1913/04/25 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 5:10:49 PM
Creation date
9/25/2020 2:44:25 PM
Metadata
Fields
Template:
Council Minutes
Date
4/25/1913
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
531 <br /> fir <br /> The regular Admin0atrative Session of the City <br /> Council.wee held April 25th,1913,at 10:30 A.M.,with <br /> Mayor Chrleteneon In the Chair and all Commlesl0n0re <br /> present at roll call. <br /> On motion minutes were approved as of record <br /> Protest of W.C.Coleman on South Rucker Avenue <br /> Improvement was accepted and filed <br /> moved by Erpdeck,seconded by Thompson: That <br /> .h0 time of hearing on South Turner be laid over two <br /> weeks, Carried. • <br /> Roved by erodeck,seconded by Thompson: That <br /> the City Engineer change the plans to conform to the pe- <br /> tition on 1ambar0 Avenue,providing for a 30 ft.street <br /> and that the time of hesniog be continued ten days,until <br /> L., may 5th. Carried. <br /> Report of the City Engineer on the proposed im-. <br /> provement of Walnut.Street from the south line of Everett <br /> Avenue to the north line of 16th Street,weereadasfollows: <br /> Total estimated cost $36,620.00 <br /> Amount to be assessed against abutting <br /> lrmpetoy assessment- 16,62,00 <br /> On motion same was accepted and filed::plans <br /> and epwclficatlons were submitted by the City Engineer <br /> and commissioner of Ihb11c works and were adopted and •' <br />
The URL can be used to link to this page
Your browser does not support the video tag.