Laserfiche WebLink
• <br /> the changing or removal of saki pipe line from Ball <br /> e treete,the said company shall,upon notice from said <br /> pity,change or remove Bald pipe line at its own coat <br /> and expense. <br /> 4th:The said company shall save the city <br /> of Everett harmless from any and all damages or suite <br /> suffered Or brought by any person or pereone by reeeon <br /> of tie construction,operation or maintenance of Bald <br /> pipe line.under call permit. <br /> 5th: In the event that the city council <br /> of the city oI Everett ehall at any time determine that <br /> the maintenance or Operation of said pipe linea under <br /> said permit interferes with the nee of said street,or -j <br /> endangers travel on sail street,or that public necessity <br /> for any reason required the removal of said pipe 11nee, <br /> said council shall have the right to terminate this per- <br /> mit,and said company shall,within sixty(60)days after <br /> ,notice from the city council,remove said pipe lines <br /> from said streets. <br /> 6th:During tie continuance of this per-_ ,4 <br /> mit the city council of the city of Everett shall have <br /> the right to make snch further regulation or require- A� <br /> menta in regard to sail pipe line as It may deem neo- <br /> eseary or desirable. <br /> 7th:Before beginning work under said per- <br /> mit,call company shall file Its written acceptance of <br /> the Lerma of this permit,with the city of Everett. <br /> 4 <br /> ) <br />