My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1916/08/10 Council Minutes
>
Council Minutes
>
1916/08/10 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 4:53:32 PM
Creation date
9/25/2020 3:14:31 PM
Metadata
Fields
Template:
Council Minutes
Date
8/10/1916
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The adjourned meeting o.the City <br /> Council from 10:45 A.M.vee held at 2:00 P.M.with <br /> kayos Merrill in the Chair and Commissioners Merrill <br /> and Clay present at roll call. <br /> On motion minutes approved ae of re- <br /> cord. <br /> Bids for the improvement of Norton Ave- <br /> nue from Bebinaon Mfg.Co.to the 14th St.Cock were ,? <br /> 0onatdered as follows: <br /> teeriean Pile lo1eingg Company:3ueete Cut old growth <br /> piles, <br /> $11495.le,Extra edarP1lea Extra Per <br /> pile;,59.00 per pile,Extra Cedar PS1ec,S4.25 pax <br /> pile;Extra Lumber.$16.00 per M. <br /> 0.W.Rutherford,Winter Cut Fix.$11550;Cedar,$11009.20, <br /> Extra fir piles,$4.10 per pile,Extra cedar pilee,$4.46 <br /> per pile;Extra lumber 116.00 per 4; <br /> Everett Cenetructlen Company:T <br /> ar Cut old growth fir <br /> Piling,$31490.00 Winter cut $11535.00;Cedarl1$11970, <br /> Extra Fir Piles,$3.94 per pilxtra Cedar Pllee,13.94, <br /> Extra Lumber,$18.00 per M. <br /> Geo.C.Clark:Summer Cut old th Fir Piling;511,900; <br /> Winter Cut Fir,513039.CC, 1769.00;Extra Fir Piles, <br /> 14.00pe518ile;extrra()alar piles,$4.00 per p13eExtre. <br /> lumber.T.A.MCEaehern Co:Summer cut old growth fir piling, <br /> $11,603.30;Wintei Cut Fir,511983.46;Cedar,glispg.34. <br /> Extra Fir Pilea,$4.60 per Pile;Extra Lumber,514.60 per R. I <br /> Moved by Kelly,seconded by Merrill that <br /> eoneiaeration of bide of the Everett Construction Company <br /> and the American Pile Orlving Company for Wale improvement <br /> ba cantlnuea to 10:30 A.M.August 14,1916,and that the <br />• <br /> bias of Gee..C.Clark,D.W.Butheiferd and T.A.McEachern <br /> &Co.be rejected ane their good faith deposits be return- <br />• <br /> ed. <br /> Carried unanimously <br />
The URL can be used to link to this page
Your browser does not support the video tag.