|
ijOA Oi;
<br /> iio
<br /> lerage NAY 4th,1934.
<br /> fifteen
<br /> an durinz The Regular Administrative Session of the City Council:vas held an.
<br /> rendition May 4th,1934,10-30 A.M.,Mayor Edwards in the Chair,Commissioner Ericson present
<br /> ufrom and Cos'eeioner'Costello absent at roll call.
<br />'ety here-
<br /> prnisheed Minute,of
<br /> lane May 3rd,,.93$read and approved aa of record.
<br /> e in theV ---
<br /> tug. Moved by Ericson,seconded by Edwards,that the expenditure of the L
<br /> install m of$350.00,by the Water Department,1n connection with the United States Geo-
<br /> per
<br /> h apt• logical Survey,Department of Interior,in establIehOng a gauging station on the
<br /> say's_ Suit.River,be approved.
<br /> e Its --- Carried. jf'.✓
<br /> 101 no-
<br /> gg kea Moved by Ericson,eeconled by Edwards,that Resolution No.3849 be
<br />:r,and adopted as follows:
<br /> ".ESSCLUTION No.3849."
<br /> Pert
<br /> eminent RESOLUTION AUTHORIZING TEE EXECUTION AND MLIVBRY OP A CONTRACT WITS PUfiT SOUND
<br /> ie POWER&LIGHT COMPANY FOR PRRUISNIEG CITY OF EVERETT,
<br /> WHEREAS,Puget Ssund Power&Light Company bee offered to furnish for a period of
<br /> Ten(10) areupon the..terma set forth in the fallowing pro Pomo sed foof contract
<br /> to-wit: Municipal Water Pumping Service:
<br /> Municipal Water Pumping Power Contract. Puget Sound Power&Light Company,herein
<br /> called.Company., d the City o£Everett,a municipal corporation of the State of
<br /> Washington,herein celled"City,"agree as follows:
<br /> First: This contract only corers power used an connection with the operation of
<br /> water dletrlbuticn eyeteml.
<br /> Sec.
<br /> herein.etipulatedconsideration
<br /> ,the or payments
<br /> dulimitations,
<br /> riod of10consecutive yes e,begln
<br /> Dist. l•2
<br /> 1934,to reserve for and furnish to the City,and City agrees dnri
<br />:t c _ period to buy,exclusively Brom the Company,at the.rates herein fixed,all eleetrl•
<br />.Ching of
<br /> power required to operate the City's ter ping plant or plants located and dee-
<br /> he Mayor water
<br /> rlbed as follows: Alderwood Extension,Pumping Station No.4-Beverly Hills,Reser
<br /> ntract entat
<br /> lair No.3.said electric powershallbe three-shoe.,sixty°rola,alternating earr
<br /> Proximately 240 volts,Company agrees to furnish of exceeding 100 horse-
<br />:uthori setl0
<br /> CSty. power,but will furnish any additional amount required by the City if t ae the
<br /> Power available. The point of delivery shall be Pump.Nouse at shove nation.
<br /> Third, Rates-The City agrees 00
<br /> to pay the following rates,same being Schedule No.
<br /> VV^• 40 of the Company'.Electric Tariff Ea.I,filed with the Department of Public Work/
<br /> f the State of Washington:
<br /> Flr Demand Charge-$1.50 per month per kilowatt,or major portion thereof,of maximum
<br /> mend.
<br /> Fmergy charge-$,.006 per kilowatt hour for the first 25,000 kilawarr hours used
<br /> per month.
<br /> $0.005 par killawatt hour for all over 25,000 kilowatt hours used
<br /> peronth.
<br /> Said are subject to change in accordance with the laws of the State of Waeh-
<br /> ington,and whenever a schedule of x service is m effective
<br /> e City shall thereafter pay the rates:provided,if the new rates arehigher
<br /> than those herein fired,the City shall be entitled to Cancel this contract,if the
<br /> new rates are lower such lower rates are to be effective during the unexpired term
<br /> I of this contract.
<br /> All bills shall be payable within ten days from their date.
<br /> edrthtl Measurement-Mm aximdemand,consumption and power factor shall be m a
<br /> by c accurate a rate maximum demand,watt hour and Power factor meters£cr-
<br /> hod and installed by Company:suitable space for which shall be furnished by
<br /> e Litt':provided,maximum demand andfactor may at Company's option be de-
<br /> termined either by meters or by check of service
<br />
|