Laserfiche WebLink
ijOA Oi; <br /> iio <br /> lerage NAY 4th,1934. <br /> fifteen <br /> an durinz The Regular Administrative Session of the City Council:vas held an. <br /> rendition May 4th,1934,10-30 A.M.,Mayor Edwards in the Chair,Commissioner Ericson present <br /> ufrom and Cos'eeioner'Costello absent at roll call. <br />'ety here- <br /> prnisheed Minute,of <br /> lane May 3rd,,.93$read and approved aa of record. <br /> e in theV --- <br /> tug. Moved by Ericson,seconded by Edwards,that the expenditure of the L <br /> install m of$350.00,by the Water Department,1n connection with the United States Geo- <br /> per <br /> h apt• logical Survey,Department of Interior,in establIehOng a gauging station on the <br /> say's_ Suit.River,be approved. <br /> e Its --- Carried. jf'.✓ <br /> 101 no- <br /> gg kea Moved by Ericson,eeconled by Edwards,that Resolution No.3849 be <br />:r,and adopted as follows: <br /> ".ESSCLUTION No.3849." <br /> Pert <br /> eminent RESOLUTION AUTHORIZING TEE EXECUTION AND MLIVBRY OP A CONTRACT WITS PUfiT SOUND <br /> ie POWER&LIGHT COMPANY FOR PRRUISNIEG CITY OF EVERETT, <br /> WHEREAS,Puget Ssund Power&Light Company bee offered to furnish for a period of <br /> Ten(10) areupon the..terma set forth in the fallowing pro Pomo sed foof contract <br /> to-wit: Municipal Water Pumping Service: <br /> Municipal Water Pumping Power Contract. Puget Sound Power&Light Company,herein <br /> called.Company., d the City o£Everett,a municipal corporation of the State of <br /> Washington,herein celled"City,"agree as follows: <br /> First: This contract only corers power used an connection with the operation of <br /> water dletrlbuticn eyeteml. <br /> Sec. <br /> herein.etipulatedconsideration <br /> ,the or payments <br /> dulimitations, <br /> riod of10consecutive yes e,begln <br /> Dist. l•2 <br /> 1934,to reserve for and furnish to the City,and City agrees dnri <br />:t c _ period to buy,exclusively Brom the Company,at the.rates herein fixed,all eleetrl• <br />.Ching of <br /> power required to operate the City's ter ping plant or plants located and dee- <br /> he Mayor water <br /> rlbed as follows: Alderwood Extension,Pumping Station No.4-Beverly Hills,Reser <br /> ntract entat <br /> lair No.3.said electric powershallbe three-shoe.,sixty°rola,alternating earr <br /> Proximately 240 volts,Company agrees to furnish of exceeding 100 horse- <br />:uthori setl0 <br /> CSty. power,but will furnish any additional amount required by the City if t ae the <br /> Power available. The point of delivery shall be Pump.Nouse at shove nation. <br /> Third, Rates-The City agrees 00 <br /> to pay the following rates,same being Schedule No. <br /> VV^• 40 of the Company'.Electric Tariff Ea.I,filed with the Department of Public Work/ <br /> f the State of Washington: <br /> Flr Demand Charge-$1.50 per month per kilowatt,or major portion thereof,of maximum <br /> mend. <br /> Fmergy charge-$,.006 per kilowatt hour for the first 25,000 kilawarr hours used <br /> per month. <br /> $0.005 par killawatt hour for all over 25,000 kilowatt hours used <br /> peronth. <br /> Said are subject to change in accordance with the laws of the State of Waeh- <br /> ington,and whenever a schedule of x service is m effective <br /> e City shall thereafter pay the rates:provided,if the new rates arehigher <br /> than those herein fired,the City shall be entitled to Cancel this contract,if the <br /> new rates are lower such lower rates are to be effective during the unexpired term <br /> I of this contract. <br /> All bills shall be payable within ten days from their date. <br /> edrthtl Measurement-Mm aximdemand,consumption and power factor shall be m a <br /> by c accurate a rate maximum demand,watt hour and Power factor meters£cr- <br /> hod and installed by Company:suitable space for which shall be furnished by <br /> e Litt':provided,maximum demand andfactor may at Company's option be de- <br /> termined either by meters or by check of service <br />