Laserfiche WebLink
38 <br /> 38 <br /> FEeROARr 1811:,1938. <br /> The Regular Administrative Session of the City Council was held on <br /> February 15th,1038 at 10 am,Mayor Edwards in the.Chair,Commissioners Spencer and <br /> Williams present at roll call. <br /> Minutes of February 14th,1938,read end approved. <br /> __ <br /> • <br /> Moved by Spencer,eeoonded by Williams to adopt Resolution No.4347 <br /> • <br /> as follower ^ RESOLUTION N0.4349. <br /> WHEREAS,the City of Everett heretofore,to-wit:On the 24th <br /> • day of December,1936 entered into a certain oxitten contract with <br /> ; .'Westrn Pipe 8 Steel Company of California, California corporation, <br /> for the co truotioo of a pipe line,said work being known es Section 1 <br /> 2 hnd 3 of Sultan River Pipe Line Projeot No.3,said contract being in <br /> the original amount Of$1,259,368.90;and <br /> WHEREAS,through no fault of the contactor there remains in- <br /> cident to said contract a wall amount of clean-up work,which clean- <br /> up work the City•of Everett,by reaeon of weather end soil conditions, <br /> • ' deems it Inadvisable end unwise to complete at the present time;and <br /> • <br /> Wfffii8A3,said original contract is eubetaatlally completed and <br /> all work thereunder performed,with the exception of said emll mnount <br /> of clean-up work,and ready for acceptance,and said pipe live is now <br /> . being used by'the City of Everett. <br /> • <br /> NOW,TPBRd.PORE,BE IT RESOLVED that,subject to the approval of <br /> • Pu83 Works Administration,said contract between the City of Everett <br /> Co <br /> and said Western Pipe&Steel Company of California,a California <br /> corporation,bearing data of December 24th,1936,covering the construe- <br /> " • tion of a pipe line,oa10 work being known as Section 1-2 and 3 Sultan <br /> River Pipe Line Project No.3,be,end the same is hereby declared cora- <br /> • <br /> . plated,and said work and maid eontraot Soo pled by the City of Everett; <br /> • provided,however,that there shall be retained from the eye and <br /> tamed percentage due to said'Western Pipe 8 Steel Company the sum <br /> of$10,000.00,to insure the completion of said clean-up work,end such <br /> liens which may be filed against said job prior to the expiration ed of <br /> • <br /> said thirty(30)days period,except such liana es may be s0 filed which <br /> ' have been paid or satisfied and proper releasee thereof filed with the <br /> ' City of Everett,and that said wore shall be oompleted by said contract <br /> whenever directed a to do by the City engineer of the City of realoet,or or <br /> • withttermer s andreo conditions of said <br /> saideen-Eiect. Saidrk to srdone <br /> tained sumshall <br /> be retained by the City of Everett until euch time as saki clean-up noon <br /> ie fh,elly completed and formally accepted by the City toun011 of the <br /> • City of Everett;and for the further period of Thirty(30)days there- <br /> ' after. <br /> fthe <br /> fouch <br /> oocolla retained sun shalleriod no l <br /> aime shall <br /> havebeen filed against said jb, be paid to <br /> • the Western Pipe 8 Steel Company of California,and if any Claims are <br /> filed against said job during maid period said sum shall be retained <br /> until euoh claims are fully paid and satisfied,or releases thereof ewe <br /> filed with the City of Everett,or it is determined that such claims are <br /> not valid claims. <br /> Carried uianioun,, . <br />