Laserfiche WebLink
- 1 I <br /> October 4,1956 continued <br /> PROGRESS ESTIMATIES Moved by Gebert,seconded by J.nson to ap rove City Engineers estimates <br /> a.vake parrents to contractors as follows: <br /> L.2.0.4 Estuette 0 Connector Amt.payable <br /> 638 Moller Larsen"on $ 195.88 <br /> 640 2 lareen ti Son 1,722.34 <br /> 641 1 Moller Larsen 8 Son 1,692.22 <br /> 643 1 Louis Y.Mthestm 1,561.26 <br /> Carr.d. <br /> --- <br /> Moved by Johnson,seconded by Cobert Mat Everett A.Nogland Ile granted per- <br /> ...ion to construct cencrete weesa a.install 2 gasoline Pumies llie <br /> street near the property line at 32.and Mena Sts.as per City Engineers <br /> sketch 41063. <br /> Carried. <br /> --- <br /> BIDS Moved by Cul...,,,c,..3 by Job..,to call for bids for painting Cl,val s <br /> 1113 a.,ceilings of tbe Ole.te Treasurers office. <br /> Carried. <br /> .031106,rhO meting adiourced et 10:25 3,8 <br /> j--714,/ City Clerk <br /> Re and approved an of recC.,OCt.5,1955. 38yor <br /> I I <br /> I / <br /> ce <br />