Laserfiche WebLink
l.r <br /> [ <br /> December 1959 continued <br /> OSOPOSALS ON Proposals were received on cne ir,ection weeer pipe at United Concrete Pipe <br /> PIPC 2NSPELTION ea follows: <br /> 1:aarirfLWiee'tngt1',ontoirieera. I45.45 <br /> 900.00 <br /> Pittsburgh ftsting laboratories .0.00 <br /> Northwest resting Laboratories 845.00 <br /> Moved by Caber,seconded by Johnson to award Job of inspecting pipe at <br /> United Concrete Pipe to Robert W.Runt,Engineers. <br /> Carried. <br /> Moved by Johnson,seconded by Cebert to authorise Mayor and City Clerk to <br /> AGREPMENTS sign the following agreements with the P.0.0.: <br /> Contract on incandescent street lighting <br /> Contract on mercury vapor street iigbling <br /> flunicipal waterpumping power contract for Reserve.Pg and Alderwood Reservoir <br /> Municipal water pumping power contract for Reservoir 03,Beverly Rill, <br /> U.S.99 near Fairmount and Panther Creek Chlorina“on Plant. <br /> --- <br /> iairliON OF Petitor,protesting unsightlinese.premiees at Camp's service station and <br /> "POSERS drIVe-in re[elVed and referred to Building Inspector. <br /> motion,the meeting adjourned at 10130 ....:4114.,51 City Clerk <br /> Read and a,prorad aa of,.ecora,Dec.18,1959. <br />