Laserfiche WebLink
April 13,.62 continued <br /> RELBASS secon <br /> ed <br /> he <br /> lease <br /> of retained <br /> percentage <br /> OF <br /> RESATIBIT moved ere,ee.of the Summit tunnel to Lard Bros.Contractors Co. <br /> as the follows. <br /> Total tetu.ed Percentage 44,.31 <br /> Less amount to be paid to Gray and Osborne 10,857.86 <br /> .ss amount of DaV.and Warren claim 3,105.00 <br /> said claim 500.o. <br /> yet„„runurn mrd Bros. Uponcell cel$57,984.45 <br /> arried=unanimous. <br /> SWGINEBRDIG • Moved by SLopson,seconded by Johnson to-approve for pe,nent the claim of <br /> .CU. r ay and Osborne for engineering services on Schedule IV of sewer probe, 1 <br /> covering period ary 4..61 through February 21,1962. Said claim <br /> m me amount ofe$10,,85.86 to 6e deducted from tore eros.retainedpert. s. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> Co potion, e meeting:d4ov ted at 10.x5 8.m. i . or clerk <br /> Read eed 5p 88 88 of record,APr.16,'196x. Mayor <br />