My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1964/01/10 Council Minutes
>
Council Minutes
>
1964/01/10 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 7:16:09 AM
Creation date
9/28/2020 4:25:44 PM
Metadata
Fields
Template:
Council Minutes
Date
1/10/1964
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ihe Regular Adminlstrative Sessionof the c=c,co..eil,mn hela at L9 <br /> January 10,1964,Mayor Cebert prealdIng. Commissioners Johnson and Simpson present at roll call. <br /> BID Moved by Gebert,seconded by Sampson to award the bid for furnishing the <br /> AWARD Grey's 1964 requirements for liquid asphalt to Union Oil Co.as per <br /> fsrried⢠<br /> BID moved by cbert,seconded by Sinnson to award the bid for furnishing <br /> AWARD the City's 1964 requirenmnts for Asphaltic concrete(hot mix)to ibish <br /> ington Asphalt Co.,the low bidder. <br /> Carried <br /> BID AWARD Moved by Gebert seconded by Simpson to award the bid for furnishing <br /> Lb.City's 1964 requirements for asphalt maintainence mix(Dud mix) <br /> to Washington Asphalt Co.,the low bidder. <br /> Carried. <br /> DID Moved by Gebert,seconded by Johnson to award the bid for furnishing <br /> AWARD the city's 1964 requirements for asphaltic concrete,class B and all <br /> castings to Associated Sand and Gravel,the lov bidder. <br /> Csrried⢠<br /> CONTRACTS Moved by Simpson,seconded by Johnson to authorise the Mayor to sign <br /> SIGNED all contracts on the above mentiOned <br /> ferried. <br /> BIDS Bide were received for furnishing the Hydrant Dept.with one Utility <br /> RECEIVED Body as follows: <br /> Paul Haggard Co. 1310.04 <br /> Truck Welding Equip.Co. 1393.60 <br /> Bid to be awarded January 14,1964. <br /> --- <br /> ENGINEERING Moved by Simpa0n,seconded by Johnson to approve for payment the claim <br /> CLAIM of Gray and Osborne in the amount of$4721.4)for engineering service <br /> on Schedules RI azul XII of the sewer project. <br /> Carried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.