My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1964/03/11 Council Minutes
>
Council Minutes
>
1964/03/11 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 7:17:20 AM
Creation date
9/28/2020 4:28:01 PM
Metadata
Fields
Template:
Council Minutes
Date
3/11/1964
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9Mrch 11,1964 LLA <br /> The Regular Administrative Session of the City Council was beta at 10 ,tp,' <br /> March 11.1964,Mayor Caere presiding. Commissioners Johnson a.Simpson present at ro,c°11. X,1: <br /> Minutes tf the meeting held March 10,1964 read and approved. <br /> BIDS Bids were received for the installation of sewers in Forest Pa,Drive 4 <br /> RECEIVED from Mukflteo Blvd.north for 500 ft.mil unier LID 675 as folloNS: <br /> Sneleon Plumb.and Heating 5911.88 <br /> Hobeck Baokhoe Service 6087.20 <br /> Universal Contractore 6566.70 <br /> Eerkes Contracting 6593.60 <br /> T. Sheldrup Cont. 8372.00 <br /> Vingfield Conat. 9063.00 <br /> National Construction 9237.00 <br /> Bid to be awarded March 16,1964. <br /> Carried. <br /> -- <br /> BIDS Bids were received for X1rnishing the Communications Dept.with one <br /> RECEIVED 1964 3/4 ton cab and chassis as follows: <br /> Walah Platt Motors 2248.39 Motor Trucks Inc. 2406.56 <br /> Bid to be awardedEarch 12,1964. , <br /> --- <br /> ENGINEERING Moved by Simpaon,seconded by Johnson to approve for payment the claim 10 <br /> CLAIM the amount of 97420.68,VIIray and Osborne,for engineering servides. <br /> REPORT RepOrn of the building,electrical and Plumbing insPectora for the <br /> FILED month of February received and filed. <br /> -- <br /> Moved by Caere,seconded by Johnson to accept the recmmendation of the <br /> MAID Consulting Engineer and...rd the following bids: <br /> schedule%LIU-Murphy Bros.-501,597.20 <br /> Schedule FITIB-Moctner and McCucchen -32,884.80 <br /> Carried. ; <br /> CHANGE moved by Cebert,seconded by Johnson to approve Change ord.r <br /> ORDER amount of 42531.21 to the Stelson pleg.and Heating Co.,contractor for .1 <br /> the Edgewater Sewer Project,and to authorize the City Engineer VERSED <br /> the order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.