Laserfiche WebLink
July 29,1970 <br /> HALTER HALL Jerry Hann of Lee Johnson Associates appeared and said <br /> • 002$COURSE that the contractor as a result of the request by John <br /> Hall and the Mayor,analyzed progress on the Golf course <br /> to determine whether or not it was practical to try and • <br /> • complete the Course as required by the contract.,prior <br /> to December 1,1970 instead of July,1971. His conclu- <br /> sion is that by working two shifts and paying overtime <br /> he can complete the grading,Planting and aii Other <br /> items required by the contract,including two mowings <br /> of the Course,prior to DecemVser 1,1970. To 4o this <br /> his additional cost will be 532,000.00 for 18 holes, <br /> or.$18,000.00 for the is 9 holes. If he is unable to <br /> complete the 18 holes or the 9 holes then there will be <br /> no,additional cost charged to the City. The cost trade <br /> offs are as follows: <br /> Outlay costs$32,000.00 with a potential income from <br /> plays in the 1970 season of$40,000.00 to$60,000.00. <br /> Without the accelerated program,play could not begin <br /> until the spring of 1972 and the City would accept the, <br /> responsibility of maintenance of the Course in July, <br /> 1971- The effect would be additional cost for course <br /> nhintenance in 1971 with no anticipated revenues. Mx. <br /> • <br /> • Hann said that they were not giving any recommendations • <br /> one way or the other on this proposal,but that they had <br /> investigated the figures presented by the Contractor and . <br /> did not find them out of line. <br /> Moved by Councilman More,seconded by Councilman <br /> Callaghan to authorgze the accelerated program at an . <br /> additional cost o7901 *00 for le holes or$18,000.00 - • <br /> for the 1st 9 1.1es if completed by-December 1. This to <br /> be added to the contract of Olympic Landscaping Colgsany <br /> • <br /> on 11.Walter Hall Golf Course.. <br /> ROLL CALL: <br /> AYES: famous,Dobler,Callaghan,Gebert,Mooze,Vognild <br /> • NAVES: Michelson <br /> Motion carried - <br /> The President said the request regarding the Turf Building <br /> Material and the Golf Course Inspection irould be continued • <br /> until August 5th. <br /> PINEHURST Mr.Tyce Soone appeared requesting the installation of steel <br /> poles instead of wood pUes on Commercial. Mr.Haglund, <br /> City Engineer,appeared and said the cost of such poles <br /> were prohibitive and this is why the wood poles were being <br /> installed. <br /> • <br /> Moved by Councilman Dobler,seconded by Councilman Longue <br /> tha the administration attempt co nola up the pleeles • <br /> • • <br /> • <br /> lishe poles in this area until a review can be made of the <br /> matter. <br /> • <br /> Unanimously Carried <br /> On motion,the meeting adjourned at.:25 am. Deputy City Clerk , <br /> • <br /> • <br /> Read and approved as of record August 5,1970 ciL,C.,072.,...99/14:2xesident <br /> ,• • <br /> . , <br />