My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1971/06/16 Council Minutes
>
Council Minutes
>
1971/06/16 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 8:22:10 AM
Creation date
9/28/2020 6:21:56 PM
Metadata
Fields
Template:
Council Minutes
Date
6/16/1971
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19]15 <br /> STATE HIGHWAY <br /> WORK ACCEPTEDthe sewer utility conded byCouncilman <br /> to /BroadwayIrres <br /> a.performed by the Washington Stat Highway Department at <br /> no cost to the ci <br /> moualy Carried. <br /> seconded by Councilman <br /> BID cACI. to call for bids for Glenwood Avenue oetween Evergreen WaY and enwooa. eraeson Street snco •a <br /> oe received until .00 p.m.July I, <br /> 1. <br /> a nslx <br /> DEEDS ACCEPTED connect)on Bethwow ldaccept €i....,.. <br /> streetp vemcnty from d the following:. <br />. .. unanimously Carried, <br /> AGREEMENT Mr.Jones,City <br /> settlement f the water releases controversy <br /> with the C oft• <br /> r 1- Game,the PUD h h <br /> I, 1660 Agreement for DeCelopment of the Sultan Basin comprehends <br /> I , the current action of the Cety and et is the ibility <br /> to see that any aticn regarding <br /> 1 deleyery of water is d. h regards <br /> d h he PUB <br /> 1 ) from any action with <br /> aelure to comply. He <br /> 9 ement.recommended that hC <br /> _ o£ori -fsegning of this Supplemental <br /> 1[ MoVed by CounCilman Gebert,seconded bY CounCilman La..,ta'.. <br /> }.. aut ze the Mayor SuPplemental AAgreementwith PUo <br /> I,; -. Unanimously axrved. <br /> � Councilman ci1 Landscapingpic <br /> 1 II CHANGE ORDERauthorize Change Order We.2 for extra work by f$11,275mand extend <br /> I at Walter E. <br /> lfeourSe in amounts <br /> completion date ofCcontract by 60 days. <br /> I Councelman Rucker asked Vd.Bell,Hark SuPer1ntendent,if hed the <br /> I felt'aq of tiles date,that the contractor should he <br /> $ <br /> celerrated pre Order No.1 in connection with the <br /> fauthorized ay gall,and Mr.Hcll replied that he felt <br /> 1 the <br /> tractor had it coming a$of try.date. <br /> d. <br /> CEANC nn said r for <br /> I . Walter E.Hall Clubhouse,had submitted an estimate on the <br /> repairs f the damages done by the fire out there. He said <br /> his totalestimate was 617,440.00 s <br /> 10B overhead and profit,which made a total of <br /> 516erten letter to 61r.Eykeman, <br /> Architect which stated as follows: <br /> rAs Pi <br /> ' The general rtect e p cic s <br /> A.I.A.Document A 201)states as follows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.