Laserfiche WebLink
98 <br />! Amount <br /> $280.00 <br /> Enterprises,Alderwood Trucking,Bothell 290.00 <br /> `1= Metropolitan Construction,Everett 384.00 <br /> 1 <br /> Ifthey recommended the bid be awarded to Alderwood <br /> VI qualified badder,.at herr boa of Trucking <br /> }' $290. <br /> of one <br /> dollarin <br /> Abiid disqualify <br /> a local. BID AWARD dor b ft said he didn't feel the Moved by Coarmilman Aldcroft,second <br /> on <br /> of t /loch Pine to low bidder,r s q;„ption_ <br /> at their bid of$280.i '' Unanimously <br /> Carried <br /> BIDS HEcsiVHO Eire Chief Hunter said the following bids had been received <br /> March 9 for the construction of a fire training to , <br /> Bidder <br /> nt <br /> 3`r Me Everett $61,950 00 <br /> Tata construction,_Everett 994./5 <br /> Solie Construction,Everett 63,739.00 <br /> 64,816.09 <br /> Construction, <br /> se 9ultConstruction,seat 64,890.00 <br /> I� it was their recommendation to award the id <br /> to the low bidder,Metropolitan Construction CompanY o <br /> IIthatIndustrial <br /> e0 Testing <br />' fcea maly$700to Inspect and test concrete a <br /> „ <br /> re mla=s. <br /> .1r'AwAHO by Councilman Michelson. <br /> seconded by n Kinch <br /> 1 to concur In the on t d <br /> award <br /> i 0 the bid for construction of the fire training drill tower <br /> T to the low bidder,Metropolitan Construction obid f$h1,950,end chat industrial Testing ro W.o ay at Por <br />)I' DAMAGE CLAIM ccs oeweoaeeion unanamousl eclav information said <br /> Bruce Jones,City Attorney,said Dr.Howell's damage <br /> referred back for further <br /> he had discussed the claimof0 Howell him and bad <br /> received additional Information. <br /> laYing of the new carpet came about as a necessity <br /> of <br /> finding <br /> =r water spotted to be relaid and used In the rttm - <br /> ', Dr.Howell included the cost of cleaning the ug to determine <br />. Its state. The water extraction process was necessary as a <br /> tCarpetCleaners- <br /> 3 <br /> hours <br /> + however,the charges i <br /> 81 hours at$ Re <br /> , co work done by employees-the tenants into other <br /> hour plus, <br /> the <br /> 52. f cleaning $2•51,,ern, <br />} swashing <br /> the concrete floors, <br /> running water <br /> activity. Appro Approximately persons were <br /> e$124.50 cost of T dwersand <br /> }' laying e newp and g s broken follows; <br />