My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1972/08/16 Council Minutes
>
Council Minutes
>
1972/08/16 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 8:32:48 AM
Creation date
9/28/2020 6:41:40 PM
Metadata
Fields
Template:
Council Minutes
Date
8/16/1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> 111 <br /> August ,1972 <br /> trailCounCilman Aldcroft asked where the bike trail would go from 1. <br /> 13th Street South. He said obvioualy that if they were on <br /> bike would wonderedwnere this trail would be from 13th St,Het ol#and where a , <br /> Councilmenfunds would come for it. Mr.Haglund n6 <br /> have been made for that as yet. <br /> Roll was called Councilman definite plans <br /> M 55 All Michelson nans <br /> n�ryvvryt <br /> an....°°°#t,Who said the,/were not against the application <br /> 5 {�;'l) <br /> applying for grant,but they werh'against including the bike <br /> until more e <br /> l, <br /> obt <br /> G..I1.1�n a 1 <br /> secondedMotion Carried. <br /> ed bV Councilman Dobler, <br /> Resolution k 558 afollows: Councilman Kinch to �j' <br /> AUTHORITY,.the Mayor to sign agreement with <br /> documents for supporting No.5 Gray <br /> Osborne to design and prepare specifications and bii 4,at $I <br /> transmission line <br /> west side of Ebey Slough Crossing. <br /> fcEE notified the <br /> City otheir intent to reconstruct the bridge acr <br /> Ebey Slough,and <br /> nst d emission li"is 1v�1 <br /> atEREAS the proposed fill for the new bridge staucture tay, <br /> cover the pipeline and it will be neeossary to protect it <br /> overtical and lateral f the vent damage to and failure I <br /> stresses <br /> determineWHEREAS an Engineering Study is requared to <br /> most1 and feasibleprotect the pipeline,and <br /> WHEREAS <br /> Council of the City Of Everett hs <br /> althorized e the, <br /> 3yo ithpG sly 'il.... <br /> Osborne for a <br /> prop <br /> al to accomplish Protection of <br /> he <br /> ine <br /> wand to negotiate i Couo division Y -costs for tectiingtt pipeline 'p <br /> WHEREAS,Gray 6 Osboane has submitted a t <br /> specifications, fl Prepare <br /> al furnish <br /> construct,on plans, <br /> project t o cost n o exceed 5 x i a g ion and <br /> ocnmen a for the <br /> NOW,THEREFORE,BE It.RESOLVES BY THE CITY <br /> L OF THE <br /> COPYcrouo hl OF EVERETT that the Mayor he zed t ept t the protectLon of the <br /> rt,line,and the ameaaqihna theretog drawings and <br /> icacanna. 1. <br /> =� <br /> ac- _ .a11ea wren all corncilm ' <br /> not a_ca. iy <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.