Laserfiche WebLink
REARING Hearing was held on the bid <br /> award for <br /> the northwest corner of eHewitt Broadway,structural <br /> sidewalk called for <br /> ThePaSwith s were ol <br /> tnee chconstruction projects. <br /> 1. . ar cons on,Ino.-10'1/.72-$5,792.17 <br /> Claim for work performed and/or material supplied. <br /> 2. Harry E.Matthew. 4/21/72-5762.32 <br /> Claim for work performed and/or <br /> c - Construction ,Inc., sub-contractor. <br /> 3. .r <br /> ac ate. Works SupplyCo.,ir._. 4/24/72-$467.63 <br /> Claim foor2maat gals su_e ed. his claim was can- <br /> celled4. Stoen Construction Company-6/15/72-$1,088.88 <br /> Claim <br /> l led for materials 6/ / supplied. This claim was 4.t <br /> cance5. 'Lamb Rock Corporate.:-6/23/72 $1,275.15Claim for work Performed <br /> and/or s Hrsudt I. <br /> sub-contractor. <br /> rLa Notice of intent to ale fn aehea.file formed and/or 'ti)1 <br /> materi21s ea 7. :Begis-8/23/72-$60.04 I <br /> Claim for materials sUPP/ied. <br /> 8. $AssociatedSand nd GravelInc.-10/10/72- '� <br /> o:t el sost <br /> Claim x work performed and/or supplied. <br /> .. Ornamental 0/18/72 $15,549.60 <br /> aim for work rformed and/ormaterials supplied. <br /> _0. nisy_$Nnpre,s nate P.-9/71-6/;72-$2,430.72 ysg <br /> Claim for workperformed and/or materials supplied. <br /> i <br />