Laserfiche WebLink
3) <br /> T974 .d <br /> !!!9f <br /> Tia' iE'that althOtigh Minoan industry appears to be the low bidder,hhe-lid ° <br /> ty <br /> gn which saatas on Page <br /> at 9three <br /> id ' 1 fs i 9h <br /> 1 vaultsh shall <br /> be furnished f 1 bidinclude quotation <br /> tept it hM1e 1 by e ty1 1 h <br /> G <br /> City Council award h Keene TransitSystems expo ai 1 <br /> ble bidder, dr h d as uniesponsive. <br /> I1asked i y possibility <br /> e Kesna Company could <br /> hare meant to include thevaults with tike bd he dtel <br /> phone <br /> call had been <br /> made to M1 they had p that only sh <br /> ca <br /> vault was involved in bid. <br /> ndrmanner by h Y er,it could d h time a wn-out as a no bid fi sronsve 1 g. i Y <br /> Moved by Codncilman Aldcroft,seconded by Councilman Kinch to award the bid as r m r <br /> ended't sane aFaltDiviei the sole responsible bidder and that <br /> Duncan Industry's bid be considered unresponsive. <br /> Roll was called with all Coundilmen"voting yes grcept CounDiiMan.M.MelsOn wM1d voted <br /> Motion Carried <br /> Llocd H ni of the erihc nap reported o the fcllowing bids r vied <br /> Tan ye29;n19)4 for 9 larm ableaF.tension to-the C my ni spaicM1 Center. <br /> Humphrey Seattle 819,38).20 <br /> (Int <br /> luded <br /> qualification letter stipulating a September <br /> delivery date on cattle andcalled for H completiad date <br /> slide.) <br /> Cam-Co,Inc.,Tacoma 18,111.)] <br /> Great Lakes Pacific,Kirkland 16,226.75 <br /> (Included qualification letter stipulating amid-September <br /> delivery date on cable a called fora completiondate <br /> 'elide:) <br /> Star Electric,Des Moines 14,276.85 <br /> Heckendorf Electric,Everett 13,018.90 <br /> Lord Electric,Everett 12,911.85 <br /> (Inel'udualiTICafYon'lattez stipulating a-36-week <br /> delivery time on the cable and called for a completion <br /> date slide.) <br /> .)e <br /> awHenning all qualified b e be r ted a he project h <br /> ardedt a ox bidder hd <br /> dderwho did not qualify his bid rejected <br /> Electric,and <br /> that`lig provide he Cit thin o kce f'o his <br /> cable will b available within h time limit. ppla that the <br /> The Council asked Mr.Hendricha-if thiscould bereqd b d d l�"_ <br /> Hendricks said because of thsenergy c i i,hefeltthereething <br /> Sn wri%iffq,M a Supplier-that the material will ii <br />