My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1974/05/29 Council Minutes
>
Council Minutes
>
1974/05/29 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 8:57:29 AM
Creation date
9/28/2020 7:09:30 PM
Metadata
Fields
Template:
Council Minutes
Date
5/29/1974
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
235 <br /> May 20.19'14 <br /> e1 'Min the Council eeting yCouncrl was- called <br /> ch es f A <br /> rol 1 was ound thatyall eouncx men wer r ent. presiding. 10 Upon <br /> A.M. <br /> Minutes of the meeting held May 30th'dna 22nd umre approved as printed. <br /> ASIAN V/SITORS <br /> Mayor <br /> IntroducedSheik 7p h 1 who in introduced aprbusinessmen Countrieswho-werehexchangerogram h the Everett Rotary <br /> TeeA PLAT Az E <br /> ReiShockey of k the1 of C 6P&48 ld <br /> for tenative approval b h plat pP 1 1 SII IuI <br /> involve1Industrial 55 acres, hacre W <br /> first Phase will include 1 f n e developed f/ndustriaor industrRark. rhe ial <br /> Sp <br /> Purposes. approval allowsthe developerl.. , I <br /> public improvemements are ents,h bconstructed lthese <br /> impr d h e°aP 1 tby he @N• <br /> orld v P 1 6 II II <br /> ofthe20thAve.Jextension. it <br /> statement' <br /> jY 21 s4 the planning s rd theapplicationd ed I} <br /> unanimou <br /> to <br /> Il approve <br /> ensiv plat,subjt recommendations <br /> lIas follows by Chstatf. Ii <br /> was assessed <br /> r 1 <br /> by <br /> The proposal <br /> againsth di d h anyeresolved through plan <br /> oVariances being by assessed I Ioh f throughnmental Impact circulation <br /> ofa Environmental G3 xs and individuals. <br /> X:C.Is2 plat sub3 y the tf1lowxng conditions: <br /> o ded approval of the II <br /> 11velalercote csdei utonctionalpt apprbals <br /> 2. 1 di 4Chapter 70U.B.C.to be complied with on <br /> 3 p 1 d z Plancbe pau h i 3 ip II II <br /> foli ° ./ b d {g <br /> 1. Document existing maximum flow quantities. , <br /> od2. i O3. Maintain existg year storm runoff. <br /> fl W Ct4 <br /> waxer <br /> 4. ^ natural <br /> T. Retention ponds as required shall be <br /> s part of the <br /> onds shall <br /> e sufficient in <br /> s overall Y b' tto retain flows from o 100Pd storm., <br /> ts to db le Evidence <br /> flowsubmittedto Illi IN <br /> be certified by a principal of the design firm. 'A�1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.