Laserfiche WebLink
243 <br /> t 8 1 <br /> June 4,1974 <br /> Revenue Sharing Arterial Street <br /> u.G.Wirang 30,000 ' <br /> Furniture 45,000 <br /> Graphics 15,000 <br /> Drains 30,000 15,000 '1, ' <br /> Hydrants 15,000 111 1 <br /> Sub-Total 495,000 210,000 <br /> sContangencies 105,000 40,000 <br /> Sub-Total 600,000 250,000 HP/ <br /> Grand <br /> Total 850,000 <br /> *Sales Tax 5.58 <br /> Architect Fees 8.08 [4, <br /> Fees,Permits 6.58 <br /> 1 4111115 <br /> Extraordirmry Expenses 20 9 <br /> Progect B-Hewitt to Riverside Boulevard <br /> (16 Blocks-Rucker to Riverside) <br /> APPLICATION OF FUNDS SOURCE OF FUNDS <br /> 9 11 <br /> Revenue Sharing Arterial Street .1,1 <br /> 2.11::1,11'1'We 2 n'eks 2L21',n "" 32,000 . <br /> //. Design 3,5 blocks e,4,,ggg 4,000 41,000 11 1 <br /> Rucker-Hoyt <br /> Wetmore-Broadway ' <br /> ,,1• <br /> IV.Contingencies 3,800 <br /> 22,800 l'itig <br /> Grand Total 141,900 <br /> 9..Xoslovski pointed out to the Council these cost figures were for the ' <br /> basic design only on Colby with none of the twelve alternatoves recom- <br /> mended by the Council included in this cost figure. The total cost for <br /> the three blocks of Colby and the boulevard from Rucker to 1-5 as presented <br /> came to 6991,900. <br /> After considerable discussion by the Council a.many comments by citssens <br /> and merchants,President Aldcroft announced there would be no decosion <br /> 1 1 111 <br /> made at this meeting. A workshop would be held Wednesday morning and <br /> possibly a decisson would be made during the regular meeting at 10:00 a.m. 1 1,,,i <br /> Wednesday morning. He thanked everyone for attending. <br /> • t <br /> On oNtion,the meeting adjourned at 10:05 p.M.,9,9117. A—-'1,A(11)e'u'lerk <br /> I,'1 411 <br /> Read and approved as printed teetA .j President <br /> 11 '-.1 11 W WI <br />