My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1973/12/12 Council Minutes
>
Council Minutes
>
1973/12/12 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 8:49:53 AM
Creation date
9/28/2020 7:24:25 PM
Metadata
Fields
Template:
Council Minutes
Date
12/12/1973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 439 <br /> December 12,1973 <br /> cflman Al d he still felt i d be nun "a"ee nose s pphcanevi s e area noioawt eerh C <br /> the gl d perhaps otnere woulddbehintereatea <br /> vn teeipurcna do£Ethe bu'ld'g o. <br /> Gilman W o felt the publics old be notified of ins change an the <br /> Gnomes a feaiingsleegaaing ane bnilaing <br /> Roll was called on the previous mo to accept the offer of Fay Chapman Company <br /> o purchase the property at 6110,000 <br /> Robley,Rucker <br /> NAAYYS: Michelson,Gipson,Alacroft and Winch <br /> moved • Motion Lost <br /> by Councilman Winch,seconded by s <br /> Councilman Langu accept the <br /> $715 lease proposal a anted by y Chapman Company and negotiate the terms <br /> ' o£the lease to a presented to the Council for their approval. <br /> Motion Carried <br /> movedJOB ACCEPTED <br /> by Councilman Michelson,seconded by Councilman Winch,to accept <br /> the c f Morton Avenue from 13th to Alverson Boulevardb y <br /> West CoastConstruction Com any. • <br /> Rola was called with all councilmen voting yes. pI <br /> Motion Carried •�ti <br /> JOB ACCEPTED <br /> Loyd B nnine <br /> Henning,from the Engineering Department,said the wok done by <br /> C Excavating cavatin Company on first phase of Beverly Lane from 79th to <br /> e <br /> Madison Street was complete. He eaid it had come in considerably under the <br /> bid amount,however,i should be that the second pphase wouldrobably <br /> be considerably over the bid amount. The con Lewis s Redford,who <br /> had done the engineering work OIL uthe job,had madsvaerrors in their estimates. <br /> Overall,it would probably balance, buttheir would be an under amounton <br /> this job a an v the next 3 t e recommended the job be accepted as <br /> complete. <br /> unciMaaMichelsen,seconae by c unci Man Wvnca t apt Be erly <br /> LaneafxomC]9th Bison a completedaby Ce Excav tion Com.pany.v <br /> 8011 was called with all Councilmen voting yes. <br /> Motion Carried <br /> BID CALL <br /> Moved by Councilman Aldcroft,seconded by Councilman Winch,to call 13e:bids t <br /> purchase the 1974 commercial lertilimer requirements for the golf c, _yes c <br /> Parks. Bide Co b ved unt 00 p.m...December 27,1973. <br /> Roll was called with all Councilmen voting yes. <br /> Motion Carried <br />
The URL can be used to link to this page
Your browser does not support the video tag.