Laserfiche WebLink
711 <br /> 285 c) <br /> September 22,19]6 <br /> The regular <br /> egulat 8 e3 meetinof the <br /> epEverett <br /> eZ tt1Ciity i uncal wascalled to { <br /> ordof EverettHall-.with Councilman Michelson nfp ingerence ea. <br /> 1 councilmen <br /> intattendance <br /> exceptdanceCouncilman A <br /> Gipson North B oadwayA on 8 Al.a nor[Broadway study and ntati r <br /> eoxmueeao to RE-DEVELOPMENT <br /> ae',avmAaae<iati�on.ht representatives { <br /> LANS ir <br /> Joe ozlovaki of the Planning Depar r reminded L Council <br /> cil <br /> theydad bean c urged with coming back with plane for thefollow- <br /> 9 designs: <br /> 1 cur traffic lanes plus left tui la <br /> 2. n both saes of the e h <br /> 3. Higgnnalization to be coordinated with t design. r <br /> 4. Introduction to the North Broadway area n both ends <br /> of the area. <br /> 5. Coat comparison for on-street and off-street parking. <br /> 11 1 <br /> He presented the design for the area <br /> f showing five lanes o traffic, <br /> two north and two south bound witha enter lane for 1 o <br /> turns .� <br /> nd <br /> aparking on both aides of the street. A portion of the <br /> sidewalk ea would be deleted and replaced be parking spots. <br /> There would be a gateway sign in the 2800 b of Broadway o the <br /> soul and the 800 block on a north. He aidkthere rha been A^ <br /> nog support for street identification signs with the blocknnum- <br /> bers n the sign a possibly directional signs also. O RRR <br /> Ar <br /> covered bus shelter 1 Streetarea, <br /> one on the north 11 proposed a fhrg 19th <br /> we also <br /> plans for an off parking McDougal adjacenttohe <br /> north of 19th street a Lombe d adjacent to the a <br /> side of side <br /> s would be available in the sidewalk 3 -` <br /> area if theproperty owners desired to use them. M.r <br /> The total cost far this <br /> proposal including signs,bus stops trees <br /> etc. • <br /> off-street parking, $1,221,415. <br /> He said the realized this type of funding was of available a l'.0 <br /> they were resenting a t deem type proposal which included only <br /> to aatreettotalrofl$400 000 cut <br /> oelovski sainthfeabbus stop.whichcame <br /> be "r <br /> come frontlet., • 91 <br /> which wasnaid out 't expected <br /> as o betdone untilaation 1980. Theabalance would <br /> hbaPto tote fromtheCumulative Reserve for Community Development Fund 'RiI <br /> d theywere suggesting taking$500,000 from this fund for the ! rft[ <br /> Councilmen Ebertandor Sugg d doing w job at pre- <br />,- un than just Ntheepphaseesuggested byhthe hconsltants. r. <br /> They felt this wouldbe more appropriate and that funds would b <br /> available in the future for thesouthend,Evergreen Way area. <br /> President G oreturned <br /> e <br /> com- <br /> mittee to come <br /> kwith an actual detailed cost <br /> o what Edbdone for the$650,000 availablehe Iordinance <br /> La <br /> at the 404 level available to each district. <br />