My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1976/12/07 Council Minutes
>
Council Minutes
>
1976/12/07 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 9:29:46 AM
Creation date
9/28/2020 8:46:37 PM
Metadata
Fields
Template:
Council Minutes
Date
12/7/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ .yam....�- - F b xr .>,� •. g�l <br /> AM- <br /> MEETSWD. <br /> _410 <br /> December 0 L <br /> 7,,.19]6 <br /> h2:30 Everett Councihnen Gipson,Gans,MooreMichelson, S ett <br /> , <br /> Mayor Anderson,City Attorney Disompson,and City Engineer Lloyd Henning <br /> joined mmissionersat their <br /> meeting in the PUD blinding,to <br /> difference in understanding o the P s policy on put- <br /> ting <br /> ut- <br /> tin• gucve heass d power linea underground. <br /> The City had questions in two areae,long range,and specific contract <br /> language. <br /> POD Hagar H Hulbert explained that they developed the p f set- <br /> ting aside 2,Bill <br /> t rebenEe from each municipality each to beMused <br /> as tchmoney w cities/customers who wished oput power nes <br /> under508ground. If on is not used within the specified year,l it re- <br /> verts <br /> r- <br /> project is contemplated,a cite <br /> ntdraw o maximum year allocation in advance,if t Commission- <br /> ers <br /> a approve.a This 2 of d m existingunderground <br /> systems--which answers nthecCity'sbquestion about epossiblittyeoa <br /> loin!project[ domhe streetlighting systeminm Everett <br /> Parker Williams <br /> said the C <br /> i y shL accept <br /> theQS <br /> work <br /> oa [ tf,wga vsi not wit' <br /> igibleforthematching 2 money. <br /> Th not ithe cost <br /> f providing scoirethe main to the house-- n <br /> d i TheCtyhasth po otutilitieshto hook er <br /> underground d to obtaini h f <br /> dis ponaibthe functions. Coordination i utilities <br /> would depend o the the kind <br /> ind o£financing- <br /> texp n <br /> hwould include <br /> • rocost, i to apjeC execase protect <br /> over-runs,it is heP intent <br /> applythe 28 mc the actualco t <br /> of the <br /> availableproject, e paying <br /> oothe <br /> 8 money to the Cv y <br /> Mr.Hulbert explained that on municipal lighting <br /> maintains t 1 na owns and maintains a ligtheT,and it owns the ht poles or supplyower <br /> and <br /> maintains t h City o interested in a nigher r <br /> tarda. ,with t City would Gaining the street lighting syate stem <br /> n to a ase <br /> a£ study this <br /> Ukino d indicated H he lbert al 1 a <br /> ha study than kind p Mr.Hilbert alindicated have <br /> would improve Neir maintenance of the luminaires. <br /> t was ea that telephone and cablevlavon companies, h le <br /> have to <br /> go underground if the PUD daodeae These <br /> companies d 'no <br /> pP i have <br /> a asde r Mer 2' <br /> They get theta money by rate i e Utilities from th Co:w%idi <br /> a on, <br /> and their methods of operation e differanct,b..Hulbert and <br /> the Commissioners said they would like to <br /> cntinue in <br /> close cooperation with the City,and designated Frank Nc aMark <br /> Hchirea <br /> wn s staff representatives for day-to-day con ae Council <br /> President Gipson thanked the Commissioners for sharingtheirmeetingenestab- <br /> lished <br /> at <br /> h <br /> With the City,and added that he felt a good beginning had ab- <br /> lishedfor further working together in harmony. <br /> Meeting adjourned at 4:20 p.m: <br />
The URL can be used to link to this page
Your browser does not support the video tag.