Laserfiche WebLink
70 March 16,1977 <br /> Councilman aangua left the meeting at anis time and Councilman auekett <br /> 208 STORM DRAINAGE STUDY UP-DATE <br /> Craig <br /> 08ois tSuperintendent, <br /> gave the following up-date <br /> Ert <br /> Stormudyy. Hid t l Fall 97, on <br /> City Council endorsement t d 208 widestorm <br /> drainage <br /> extend. <br /> Snohomish <br /> County Planning Environmental <br /> Protection Agency a$950,00 <br /> grant to SNOMET l bp& and tisbeganFebruary <br /> 0 E <br /> The major technical thrusts he <br /> Study h been in the reached of agri- <br /> cultural <br /> where an mationale and uworkshop rban z a ithet would <br /> urban drainagesnss session <br /> tvaere t, <br /> discussions will becentered aroud this aspec the 208 <br /> drainageUrban considerations lvei imanagement <br /> needs np prevent future drainage problems and correct existing ones. T <br /> h <br /> e <br /> first,and refuaneed <br /> ssurfacw rdrainage ndinance <br /> which w111 quire drainage p andimpose c requirements all <br /> major developments and minor developments t proposed in <br /> drainage areas. model ordinance_has <br /> tothe consultant,n <br /> t, <br /> and the anvtaSnohomish County,prepared <br /> ns Mountlake <br /> progressing toward the submission of theordinance <br /> to each <br /> agency's legislative <br /> bodies. The ordinance is scheduled for Coun- <br /> cil <br /> anaen in March. <br /> The second nestorm drainage management plans to <br /> drainagebe developed on a by drainage basin <br /> r <br /> e6 <br /> nt year <br /> s <br /> it has been demonstrated <br /> installing and larger lisdevel- <br /> the te£ tiv environmentally <br /> sound <br /> hod o handling <br /> Today,cemprehensiveseinaie <br /> management <br /> nplanst be m sophisticated a tail n my hs <br /> analysis but also 1 and financial nThis type f <br /> comprehen- <br /> sive plan has not been triedpast any great extent, <br /> participationas part of its ine08sY developing comprehen- <br /> sive <br /> - <br /> ianagementplans for two Everett. <br /> basinstwo are pgeonC it and Wood Creek via Florida DrivelThey <br /> werechosen because of their a dPotentaldra heProblems <br /> structuralwhich require and management sand <br /> hictypify <br /> pro- <br /> blemsi other asins Although hed development of the comprehensive <br /> storm drainage managem management plans a demonstration project in the <br /> 208 study,it is hoped that they successful and they <br /> will <br /> be formally adopted$ City Council in June or July <br /> 1977. <br /> The t a determination of <br /> the vee of eefffort that othedC drainage <br /> liassume <br /> City <br /> facilities in 208 Study has not <br /> construction <br /> and generated h flat enance of storm area as yet <br /> although it oint ithhadecisions will - <br /> .avefto be funding,and 90091 eelevel no effortl at . Funding options <br /> are uspect to the tility fees,0010 he p taxor <br /> ($77,000)mbination ofboth. Level of effort - <br /> rentlyadone,to designing,constructing,ween man maintaining n s c r <br /> drains and detention facilities. leveloffort an new <br /> inn <br /> reviiew bd in yaCi y Cond uncipros <br /> will hopefund cons lly occur Y June or ll have to be July 1977.al <br /> Mr.Thompson hoped t rink a to the< v <br /> 1 for re <br /> in a few months <br /> d saidt e study would probably be completed by the <br /> end of the year. <br /> s <br />