Laserfiche WebLink
380 <br /> November 16�19]] <br /> Due to lack <br /> meeting ofa quorum the workshop sessionhe E City Council <br /> ancelled. <br /> The regular meeting of the Everett City Council was called to oraeat <br /> Ha UB <br /> Hall, <br /> 6 1 Ne Council <br /> Nco ci f <br /> Chambers o Everett City <br /> 11, d ichpresiding. Upon 1 call it was found that <br /> I ry who wounci a attendance except Councilmen Langur.and Moore <br /> inu of t n he[d N r g,1 ]w approved a inted <br /> withtt c ate ordinance <br /> Leaving ce between b n dssrants as prepare <br /> 61 tan albutna ovine F ofnApp o permit variances under at cern <br /> tain circumstances. <br /> JOINT TREATMENT <br /> DickThom h received E <br /> B whichconvinced him that o nt treatment was out of the picture.om <br /> I Councilman the city had been lax Lfollowingthrough <br /> Washington, <br /> with the delegation vnDfor he eathe <br /> and Dick Thompson c form a <br /> Mayor An suggested t <br /> talk with o delegation iinWashington,D.C.for their help i <br /> this matter. <br /> LIABILITY INSURANCE C <br /> IABIL llaoldd hezooz-b <br /> Dick Thompson reported he had receive.notice that the umbrellaliability <br /> policy premium would go up to$67,832 fox this payment due. <br /> PHASE II <br /> I BOAT CRUNCH CONTRACT <br /> Moved by <br /> C 2cilma.G seconded by Councilman Alderoft toau <br /> thori <br /> ze <br /> the Ma o sign contract with Port of 8 Snohomish County <br /> for Phase III the Boat Launch Facility at estimated cost of <br /> 526,900 <br /> lea with all councilmen voting yea a ouncilmen Langua <br /> aha <br /> and called <br /> were exonaea <br /> no ion carried <br /> y.I CM-SCHOOL BUS BYSTEM <br /> CouncilmanftReported he and"Jack Requa had metwith ns <br /> e-school <br /> district Monday t h consultant for a study to consider the <br /> possibilityof merging t school <br /> lend bus system athe city traitsys- <br /> tem.em Consortium,Inc.of B had been selected. <br /> i11 <br /> 1,19 <br /> i, <br />