My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1978/01/04 Council Minutes
>
Council Minutes
>
1978/01/04 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 9:40:47 AM
Creation date
9/28/2020 9:04:19 PM
Metadata
Fields
Template:
Council Minutes
Date
1/4/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
„ <br /> • <br /> January 4,1978 5 •• <br /> .. <br /> • Ezs.=.90117.1==Re against the ordinance because it does not delete , <br /> Moved by Councilman Aldcroft,.seconded by.Councilman Baker that this i <br /> nances • <br /> - <br /> ,• declared to be thfinal Bill No. City <br /> - <br /> ., Clerk as is directede to callreadinthe rog llof Council for the final disposition7712-418 aofnd thethe ordi- . <br /> , <br /> amended. <br /> .. <br /> Roll call: Ayes: Aldcroft,Pope,Overstreet,Michelson,Baker ; <br /> .. <br /> Nays, N <br /> • <br /> , <br /> Excused:one Langus,Gipson <br /> 5 <br /> •.. <br /> , Ordinance No.493-78 adopted. <br /> • <br /> „. <br /> .. <br /> .. <br /> .. <br /> SULTAN BASIN ALTERNATIVES WITH PUS (CB7712-454) <br /> • <br /> .. <br /> .• <br /> • Jack Spear of the PUD reviewed the history that on June 1,1961 a license <br /> ! was granted to the district and the City of Everett by the EPC to construct • <br /> and operate a water supply and hvdro-electric power project consisting of <br /> ..• two dams and three power houses on the Sultan River in western Washington. .. <br /> •. <br /> • <br /> . The order granting the license directed that the project be constructed in • <br /> , <br /> : <br /> two stages,Stage 1 consisting of features required for a water supply res- <br /> , <br /> ervoir-for the city was constructed and has been in operation since 1965. <br /> , <br /> . Stage 2 would develop the hydro-electric potential of tIm Sultan River and . <br /> • <br /> was GriGrnEllY Planned be have the construction initiated about mid 1967. <br /> : This•was later deferred to mid 1969 at which time updated evaluation reports <br /> indicated the,stage 2 development was not economically feasible. cord- • <br /> • <br /> • ingly FPC granted a delay to June of 1977. On August of 1977 the <br /> to date. d, rict <br /> . requested that the FPC extend the date for submittal of the applicatiun for <br /> license amendments assuminthe district decides to with the devel- ,. <br /> . opment to January 1979. Nog fort,1 reply has been reteiveduroceed by the district • <br /> • <br /> • <br /> • He said all three alternatives as proposed today including raising Culmback • <br /> • Dam. Alternative IA included four reservoirs and four power houses. Alter- <br /> native IS had a reservoir below the diversion dam and three dams,a long . <br /> power tunnel to the third power house. Alternative 2 would also be raising <br /> the Culmback Dam. They would take water from Spada Lake through a long <br /> • tunnel and open power canal to another reservoir. <br /> • <br /> • <br /> . President Michelson felt this was a big decision to make at this time and <br /> , <br /> • suggested there should be a workshop on it. <br /> •.. <br /> Moved by Councilman Aldcraft,seconded by Councilman Pope that the adminis- •. <br /> tration and staff be requested to present their comments and recommendations <br /> both pro and con regarding these alternatives in writing to the council <br /> • <br />•.• prior to next week's meeting. <br /> , <br /> and Roll Gipson was cawholled were excused,with all councilmen voting ye.eReePt Councilmen Lang.. .• <br /> , <br /> .• <br /> Motion Carried <br /> was Presbeing continued forident Michelson said tthe Lake ee weeksStreet vacation agreement with Al Wexler <br /> . hr . <br /> ,. <br /> .• JOB ACCEPTED(CE7712-456) <br /> .• <br /> , <br /> Moved by Councilman Pope,seconded by Councilman Baker to accept the work <br /> done by Olson Electric any, <br /> Inc.on the contract for the signaliration <br /> at Pacific and Oakes as complete. <br /> - :1A1G7go' Vw='e:t!s:d'.'"irm”v'ti"Yes e"—t Councilmen <br /> ""us . <br /> , <br /> .• <br /> Motion Carried <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.