Laserfiche WebLink
39 <br /> January 25,1978 <br /> • <br /> BID CALL(C12781-20) <br /> • <br /> • <br /> Moved by Councilman Michelson,seconded bY Conncilman Alderof,te call for <br /> . bids for resurfacing of the Garfield Park tennis courts. Aids to be re-.• <br /> ceived until 2.00 pm,February 16,1971. <br /> Roll was called with all councilmen voting yes. <br /> • <br /> Motion Carried <br /> • <br /> BIDS RECEIVED 13781-21) <br /> • <br /> • <br /> Herb Soushey,Maintenance and Facilities Director,reported on the follow- <br /> ' ing bids received. <br /> ' Sign posts and sleeves <br /> Everett Steel 6.Pipe Company . . <br /> 15,139.17 <br /> Traf-Sup-Co.ine. • <br /> 5,432.50 <br /> Traffic Control Signs Company 5,049.97 <br /> National Barricade Company 5,336.00 <br /> :Igfr:eg:IeleZdarZf.:1;ebt rBeSit,11;t9f17..e.:elte tt'eee'e'e'ehe Ceeteel <br /> White and yellow traffic paint <br /> Preservative Paint Company 8.608.55 <br /> Highway Safety Products 1,616.05 <br /> Northern Ventures,Inc. 9,247.80 <br /> I;e:: :71;2eElanttg.Zal'y'eatetTlel:t:IiMILeT7'6.71f <br /> Readi-mixed concrete <br /> Mr.Boushey said only one bid was received fox readi-mixed concrete for <br /> the year 1978. This was from Associated Sand and Gravel Company and <br /> their price represented less than a 10 percent increase over the 1977 <br /> cost. He recommended attar.,the bid to Associated Sand End Gravel. <br /> Sand and gravel'• <br /> -• <br /> Mr.Bonsbey said only one bid Was received for sand and gravel also, <br /> • that being from our present supplied,Associated Sand and Gravel. Agair, <br /> their price represented leis than a ten percent increase over the 1977 <br /> cost. DICIVIREE4VCEDDRBIDID7 LV SEEnqIBDId Sand aad Graved' <br /> •.••• Emulsified asphalt <br /> Only one bid had been received for supplying the city with emulsified <br /> asphalt for the year 1978. This was from the present supplier,Chevron <br /> Company. Their bid price represented a 13}8 increase over 1977 costs. <br /> Be recommended awarding to Chevron Company at their bid of$75 per ton. <br /> :4%1.11 BID SPOt::18 <br /> .:1:11:aterial and contractor furnished in-place <br /> • <br /> - Mr.Boushey said only one bid had been received for asphalt type materials, <br /> that of our present supplier,Associated Sand and Gravel. He said their <br /> price represented an overall ten percent increase over present costs. <br /> He recommended awarding the bid for.e 1978 supply of asphalt products <br /> to Associated Sandal.Gravel at their unit price bid. <br />