My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1978/05/03 Council Minutes
>
Council Minutes
>
1978/05/03 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 9:44:08 AM
Creation date
9/28/2020 9:10:03 PM
Metadata
Fields
Template:
Council Minutes
Date
5/3/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
156 <br />• May 3, $78 <br /> • <br /> • <br />• <br /> rfor the record he <br /> 0 <br /> implemented <br /> s approvi this r sPre <br /> hut this o <br /> all the r <br /> m lemented and he was o o the <br /> Evergreen way project in the amount of$100,000. <br /> COUNCIL BILL 715-154 K <br />• <br /> • <br /> readi <br /> dinance <br /> iding for the improvement of 72th Place Southwest from . <br /> • 72th Place <br /> west from <br />• <br />• First Ridge Roadvwesterall lee tory app terminus <br /> nancesRidge Road westerly to its terminus dthe therins,allationof 8 inch <br /> wer system <br /> • <br /> President Gipson then announced we would go into workshop session. <br /> PIGEON CREEK BRA/NAGE BASIN PLAN/EVERGREEN NAY <br /> Thompson, <br /> Sewer aYtsudctduring <br /> ec ounci <br /> said l a <br /> it <br />• cussions e Superintendent, <br /> ues. tdranage <br /> along Edrainage vergreen Way surfaced. city <br /> itfinalizing <br /> Pigeon Creek � nageean, the <br /> drainage <br /> along Evergreen Way <br /> 6000 block 1 within <br /> o E i d s <br /> his basin with c 1 <br /> He reminded Council <br /> us within the storm <br /> Rn basin. The origgin the was funded <br /> money granted from the Environmental <br /> Protection AgencyedAThe intent <br /> study• <br /> of the 208 process was logsolutionsalprality <br /> within• <br /> problems heriver basin ndevelop mechanisms for arriving a <br /> solutions• <br />• other storm drainaep 1eIt was hoped by n the <br /> Study would drainageproblems. <br /> 206planning and hesolving effort <br /> after the original grant had been eexpended. The city's primary <br /> participatin the Study w t <br /> a mechanism for solvit of comprehensive storm ng <br /> drainageptoblemsthrough the <br /> ge <br /> Creek• <br /> o. <br /> plan Woodand Creek <br /> r ekivia <br /> for two basins <br /> lnThenooriginal portion of the <br /> Pigeon 208 efforts1 <br /> was <br /> anuary of 127S <br /> d the city has continued its <br />• <br />•• at developing comprehensive storm completion <br /> drainage <br /> ea basin <br /> No.1 which would reduce the <br /> ng <br /> rol <br /> rosion <br />• <br /> Creek No.id rAain- <br /> mprove PIPE. two basins. ae <br />• said that they were nearing <br /> ality.diHe then showed nslides of the Pigeo <br />• <br /> The final plan presented c the council 10010 called CUR <br /> ORIGIN RU Ill <br /> ewater iFleming at <br /> An alternative h eu eryL a filtration area <br /> a detention pond pingsypeople <br /> othelaeresed and therew be atiproceed- <br />. <br /> r eed- <br />{ getc.which would be engthy. though,woud be <br /> approximately <br /> s0eager f ak <br /> area at the ametime as Creek No.1. La3"�C <br /> President Gipson asked to e excused at this time and asked Councilman <br /> Pope to act as president. <br />• <br />• <br />• Mr.Thompson then presented the following cost estimates: <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.