|
213
<br /> •
<br /> June 7,1978
<br /> REVENUE BOND PROJECTS ,
<br /> . Project
<br /> Sewer a Bona
<br /> Total Bonding
<br /> ± Collection System $ 2,000,000 $ 300,000
<br /> 4-3 place Siphon s Lines
<br /> - Upgrade Trea Plant ACrOSS Snohomish River 200,000 0,000
<br /> - e Lift St 000,000 1,000,000 I
<br /> t r. 000
<br /> 200,000
<br /> , U-53 Southwest, U-54 Southwest Interceptor'Ph.. ,000.000 200.000
<br /> yII 000 100,000
<br /> U-40 sewer nebabrht,xiton 35,000;000 s,0 ,000
<br /> Sewer Revenue Bond Total $37,000,000 $7,200,000
<br /> ter
<br /> I U-5 R pla ee6P Bond 201,
<br /> 0209d Line 2,0 0,000 2,0 0,000
<br /> U-5]1], Le 200e,e1 se
<br /> 12.mains 1,000,0001,550,000
<br /> _ 0,000 1,350,000
<br /> U-58
<br /> Re ,000
<br /> _ ° Everett
<br /> 00;000 000,000
<br /> -s6 Misc.Pressure
<br /> IR 3ZOne s eiwithr87 192.000 300.000
<br /> U-1 Install ire Hydrants 250,000
<br /> Water Revenue Bona Total $6,5 ,000 86,592,000
<br /> . GENERAL OBLIGATION BOND PROJECTS .
<br /> G.O.Bond
<br /> Water Projects Issue Number 2
<br /> U-20 Constrect 25 Mil.Gal.Reservoir
<br /> Everett 8 2,000,000 82,000,000U-59 eofS.W.W
<br /> Everett
<br /> 880,000 00
<br /> U-60 Pumps to Casino Tank 2,300,000 3 ,000
<br /> G.O.Bond-Wates Projects Total 5.180,000 5,180,000
<br /> Drainage Projects
<br /> Implement
<br /> Creek 1C , 0,000
<br /> Implement
<br /> WoCreekPlan 40000o
<br /> U- lent Drainage
<br /> 2,000,000 2,000,000
<br /> G.O.Bond-Drarnage Proj.Total 3,400,000 3,400,000
<br /> Lab dry.Protects
<br /> L-5 Library Bathroom a incidental Remodel 80,000 80,000
<br /> G.O. d-Libr ry PrOdect Total 80,000 80,000
<br />•
<br /> Street Projects
<br /> 8-17 Casino Rd.S.W.-Evergreen to
<br /> E-25 7th Ave.S.E.-S.BroadwayHardison
<br /> to 1,770,000 1,]]0,000
<br /> Casino ,350,000
<br /> E-26 7th Ave.S.E.-S.Broadway to B-27 2]4 h 100,000 1,800.000
<br /> - t Ave.S.W.-Evergreen en to S.C.L. 878,000
<br />
|