Laserfiche WebLink
230 dune 26,1970 <br /> A spocial meeting of the Everett City Council was called to order at <br /> • 7:30 pm.June 26,1978 in tha Hearing Room of the <br /> President Gipson presiding. Upon roll call it asCfound that <br /> moore and all councilmen were in attendance except Councilman Aldcroft. <br /> CAP/TAL IMPROVEMENT PROGRAM <br /> President Gipson welcomed the citizens in attendance ank d them <br /> for being interested in the proposed ue. He said at.this meet- <br /> ing they won.be reviewing the needs of <br /> could atue so aat ne citizens <br /> become familiar with the projects a.the financial considerations <br /> would improve the bsic services Was the first ma:Or the <br /> .n s effortmayor Moore said he had campaigned <br /> y with <br /> reasons he <br /> felt l promise <br /> (1) The utility systems are Critically in <br /> in water, <br /> gsewer te, d drainage that existservices would not pedupdatingmle, y'd'sinte- <br /> (2owthThe <br /> efiroad system <br /> be nneeds <br /> extension into new areas where industrial <br /> (3) The park system needs t provide neighborhood type Parkani rthe <br /> north end, vide adeuate s nga ilv and Forest <br /> Park an upgrade tennisits all over the community. <br /> j (4) eack u <br /> c lifecommunity s been e r years <br /> ofadequatefacilitiesa l <br /> um/mu 1i-purpose art bu <br /> ue <br /> to lfld- <br /> ingwould he the a c y t for the beginning g f its growth. <br /> He then reviewed thedeficiencies i system. He said three <br /> needs badly deteriorated <br /> - f <br /> systems,the second r polio- <br /> ' and thirdt t demands o increasing development. <br /> leafy y.00's is now <br /> deteriorated and requires rs,cacement. This <br /> alswith in excess of 105 repairs laZt year and it is anticipated 120 <br /> repairs this year. The failures result in inconvenience to the custom <br /> .of course the solution wouldreplace sewers. <br /> eliminateTo meet state andfederal regulations the city must er <br /> charge into the <br /> ust be',graded <br /> river. m <br /> presentwith Standby power to eliminate P t be upgraded 10. proofing. ca exisewsting <br /> betweenstem Everett and vad-. interceptors are capacity <br /> requirementS to serve <br /> unsewered areas and to reduce maintenance and operation costs.4, projects would These <br /> qualify <br /> State f <br /> Implementationwill pend on we ant funds are made avarl- <br /> able. <br /> The n the general indrainage t <br /> - <br /> to solve were etthe <br /> overloaded sewery,to reduce street drain older perosion, <br /> watery degradation in existing <br /> natural drainage systems.He said as part of an overall county drainage study <br /> • <br /> Everett <br /> has developed • <br /> preliCreekmMI and the second wood Creek. Firy drainage plans for two ubfirstor basins,the being <br /> ndsa proposedintheban <br /> bend <br />