Laserfiche WebLink
6 <br /> September 6,1976 <br /> •1 sting Land Use Polices(al generally support the project� o=el=ne P1 Flood Pla=n <br /> Zoning, <br /> 2. The site would be filled to a height of 14,5 feet above mean sea level <br /> meekingglooey aruf flood <br /> ° Flood i and thuspro- <br /> vvd protection the entire site, <br /> 3. sthe nn fl <br /> ood waters <br /> at peak periods. below the federal standard <br /> • "less than one foot increask"and which the basis.for the c <br />• ity <br /> flood plain zoning regulations. <br /> • <br /> 4. Snohomish County Diking District has h <br /> any change in the • <br /> imp existinfhefr dikes.conditions relative to flow of flood waters illadve y <br /> •5 <br /> TheapplicaK proposed clean up andstreamline t <br /> he <br /> we <br /> a <br /> t <br /> o <br /> f <br /> e Snohomish vi9piling,dolphins,bulkheads,and other <br /> obstructions, orderin t mitigate the impacts o the 100 acre fill <br /> on flood fof the Snohomish s,plus the retention of •• <br /> 0 es in wetlands, It t applicant to adequate],addreSsthe concerns f tDiking District. <br /> • <br /> 6 ly 200 The applicant proposes to the fill b ould ekfro ther. This 200iver foot strip <br /> 12.55 feet (the height <br /> 1 existing dike)rather toof fill. This <br /> reducessetback easurfaceen area to less <br /> than one-half inch <br /> (.04 dfeet), <br /> 'foractu0eaa • <br /> Kmexisting water suraceievin by .6 inchet River mile sothe.-yr <br /> flood. <br /> Conditions <br /> for RPProRal <br /> • <br />• . Dikendfill o conducted in accordance with exist regula- <br /> tions <br /> air and bate quality. <br /> both <br /> otgv^ <br /> during <br /> harpnbend ofndthe Sp1o <br /> construction. <br /> • <br /> 1 2. Water separating and treatment <br /> r storm runoff <br /> 3. Fhverea <br /> facilities <br /> omplvs02 1e and <br /> 4 Grass plantings site control dust,used on the surface of all filled portions of the <br /> 5. tthhConsider locationthe dikes.of inlet or outlet o prevent short <br /> circuiting <br /> the in <br /> 6. e o t of any disposal operation. <br /> notice to the Planning amen at least 2 wee , <br /> comm• 7. Thaciaadhs construction <br /> buildings fill a pedestrian <br /> circulation onnhaccess <br /> n be eloped., hisplan hal consider t recommendations hEverett's Community Plan,Parks an open SpaceShoreline Plan. <br /> 6 That the piling,bulkheads, <br /> flows along <br /> the estbnk oRiver be removed by the applicant prior <br /> to filling. <br /> s. <br />• <br /> 9. That ggeometriictae is at Junction Street extending e <br /> Pr <br /> around <br /> ❑i Park a construct anbedvfvomnaltactPrior to <br /> d an <br /> north across y of Everett landfill,ad <br />