186 May 9,1979
<br />,
<br /> y BIOS RECEIVED-DCB]95-203)
<br /> e following
<br /> f1 Joe kocloyski,Project Coordinator,reported received for the waterfront Fatality t Silver hLake Bark. as had been
<br /> 1 Cobra
<br /> Con Keta
<br /> ComP
<br /> nY
<br /> Ea ce $11 Bad Bond t2Y496t 00n $103Y 0o 0.00 Yes
<br /> $108a 41]COon
<br /> Sales
<br /> Tax
<br /> lace
<br /> Alternate Bids
<br /> Subclayttbblock 7,200.00 7,200.00 6,984.00
<br /> B
<br /> 111, ,14 3,225.00 3,500.00 3,821.00
<br /> or
<br /> C roll-up.
<br /> lbetwo two
<br /> rr fbuilings
<br /> between6,913.00
<br /> 44-Add
<br /> D del of
<br /> ]'"/81.00 6,300.00
<br /> galrcBmPVgd8g ,903.00 Wilcox 00 8•240.00
<br /> Con-
<br /> structIon auction,Inc. Coma,'
<br />���... Price $103,188.00 $99,800.00 $95,Bid Bond s Yes 123.00
<br />, Base
<br /> Alternate s
<br /> 41
<br /> 6,500.00 6,558.
<br /> 6,036.00
<br /> �. B -ul 3,664.00 3 625 00 3,466.00
<br /> , clay
<br /> 011ll
<br /> block
<br /> .00
<br /> 't. ,12,doors,
<br /> f', roof between
<br /> 9,409.00 6,700.00 7,156.00
<br /> D.Alt.hadings
<br /> rem
<br />, ' nail n ale 6 960 4,819.00
<br /> ting f
<br /> existing
<br /> ,065.00 .00
<br /> i1, Slgi empeidpPP.
<br /> said th budget fc s 5104,109. f 595,123,
<br />�• over the ebudg and architect fee,brings the total cost to 510],670,or
<br /> t by$3,761.00.l' He then presented a a
<br /> ectert to t0 e$100,000. By doing projected t costs
<br /> Phase II of the f3$28,5906can request to IAC has been made
<br /> askang that thls money from nage II be transferred to Phase I to cover
<br /> ISitbudget
<br /> the bidb tto the w an Phase I. If aPProvAl iadder,M.D.adaoore Co
<br /> bid
<br /> ofrecommendang $95,123,plus
<br /> Alternates 1 3 ands
<br /> I, amount f$18,011,plus sales tau.
<br /> lu