Laserfiche WebLink
186 May 9,1979 <br />, <br /> y BIOS RECEIVED-DCB]95-203) <br /> e following <br /> f1 Joe kocloyski,Project Coordinator,reported received for the waterfront Fatality t Silver hLake Bark. as had been <br /> 1 Cobra <br /> Con Keta <br /> ComP <br /> nY <br /> Ea ce $11 Bad Bond t2Y496t 00n $103Y 0o 0.00 Yes <br /> $108a 41]COon <br /> Sales <br /> Tax <br /> lace <br /> Alternate Bids <br /> Subclayttbblock 7,200.00 7,200.00 6,984.00 <br /> B <br /> 111, ,14 3,225.00 3,500.00 3,821.00 <br /> or <br /> C roll-up. <br /> lbetwo two <br /> rr fbuilings <br /> between6,913.00 <br /> 44-Add <br /> D del of <br /> ]'"/81.00 6,300.00 <br /> galrcBmPVgd8g ,903.00 Wilcox 00 8•240.00 <br /> Con- <br /> structIon auction,Inc. Coma,' <br />���... Price $103,188.00 $99,800.00 $95,Bid Bond s Yes 123.00 <br />, Base <br /> Alternate s <br /> 41 <br /> 6,500.00 6,558. <br /> 6,036.00 <br /> �. B -ul 3,664.00 3 625 00 3,466.00 <br /> , clay <br /> 011ll <br /> block <br /> .00 <br /> 't. ,12,doors, <br /> f', roof between <br /> 9,409.00 6,700.00 7,156.00 <br /> D.Alt.hadings <br /> rem <br />, ' nail n ale 6 960 4,819.00 <br /> ting f <br /> existing <br /> ,065.00 .00 <br /> i1, Slgi empeidpPP. <br /> said th budget fc s 5104,109. f 595,123, <br />�• over the ebudg and architect fee,brings the total cost to 510],670,or <br /> t by$3,761.00.l' He then presented a a <br /> ectert to t0 e$100,000. By doing projected t costs <br /> Phase II of the f3$28,5906can request to IAC has been made <br /> askang that thls money from nage II be transferred to Phase I to cover <br /> ISitbudget <br /> the bidb tto the w an Phase I. If aPProvAl iadder,M.D.adaoore Co <br /> bid <br /> ofrecommendang $95,123,plus <br /> Alternates 1 3 ands <br /> I, amount f$18,011,plus sales tau. <br /> lu <br />