My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1979/09/05 Council Minutes
>
Council Minutes
>
1979/09/05 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:06:16 AM
Creation date
9/28/2020 9:43:19 PM
Metadata
Fields
Template:
Council Minutes
Date
9/5/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
399 <br /> September 5,1979 <br /> • <br /> The regular meeting <br /> f th <br /> e Everett ero Council was lea to order at <br /> ,ihCrs of the Everett City <br /> tPresident <br /> latal lmwereattendance,except <br /> cilman croft,who <br /> arrived at 9 Councilmen <br /> who yeas <br /> ithtCounclvmanmG paon abstain gfry n9wore approved as printed, <br /> 15 APPOINTMENT <br /> Mayor om <br /> ity"oore had b Development _ <br /> Director. He said Mr.Koester is presently City <br /> Manager of Ventura, <br /> tober the et California,an would be taking over in Everett as • <br /> 18 of 30 <br /> At BUID/NG PERMIT COORD/NATOR <br /> 75 <br /> 48 <br /> 14 YAMunicipal Intern for the <br /> 94 City of Everett,had been working on documenting procedures for 13 of an its o occupancypermit.starting <br /> from <br /> a position <br /> uilding <br /> 51 permits. Mr.Olson then explained a flow chart, h to the actual iss ft <br /> 14 a69 dinat who a keyid person <br /> this nifor the applicant to contact re- '• <br /> • <br /> • <br /> 10 manual to be issued to thepermit. He w applicant <br /> their information.vn P duces <br /> vn-hous61 the l f r the Building coordinator o d poiblyiwould pbe filled <br /> 75 • <br /> 14 sr M1 the estabvf""ty tf t e'shortene1Ycone it <br /> lapYeeinaobtavn ng rmit s ructon would be <br /> 00 <br /> 71 <br /> 45 vOIR NO.6 DEVELOP CHARGE • <br /> 31 <br /> for <br /> reported <br /> the g the subjectaofdbaadditionalmea t the <br /> onstruction of Reservoir No.6, <br /> commendation. He <br /> aiact �adLition dhav sides <br /> not be levied against <br /> basedew construction vpon the Eollowfor the gbook the position that nfactora, ed reservoir.should <br /> decision was reached • <br /> 979 <br /> ere adopted <br /> 1 • <br /> tot the lutility <br /> construction cost of a reto construct specific projects,and servoir. <br /> necessary <br /> y. posinbg a itionat l charges lduben ideyngoF d be c mowed <br /> osts twice, <br /> of ution then the form esof a developmentacharge,and again in the form <br /> I customers within thesystem. <br /> equate supply or existing <br />
The URL can be used to link to this page
Your browser does not support the video tag.