Laserfiche WebLink
400 <br /> September 10,1079 <br /> A special meeting f the Everett City order at <br /> led the Everett <br /> to7:30etember101079in the c Chambers a son presiding. Up <br /> on roll call it <br /> was <br /> und that Mayor Moore and all <br /> ex- <br /> cepto Aldcroft and Councilman nP p,who arrived at'7:40 p.m. <br /> Moved by <br /> lman Overstreet,seconded by Councilman Baker,to recess <br /> i tiverSession to discuss Council's role relative to negotiations. <br /> Roll acalled with C <br /> no <br /> voting Gilman pe,Michelsoneand President Alg <br /> • <br /> • Motion Carried - <br /> The meeting then recessed into Executive session at 7:45 p.m. <br /> The p ia1 meeting of the Everett City Council reconvened at 7:58 p.m. <br /> PUBLIC HEARING-PLAT OF MADISON PAR Councilman <br /> rest, Baker asked to be excused at this time due to a conflict of <br /> intePresident Alfcroft a Pope both said that <br /> appearancey lived n fairness c of interest thisissue <br /> othough �1 <br /> ea or <br /> question in athe nd faudie anyelt they could cobjection even <br /> disagreed with this,and n one replied. rence hador <br /> Ervine the council saying <br /> that n application has <br /> be <br /> Sr.,owner enreCeivedfromao [elnti Ds <br /> requested tentative subdivision approval and panedydevelop- <br /> ment <br /> ] _ <br /> conceptual <br /> approval byy agreeingi concept with number <br /> ofunite,of seet system and gpen space. The iwest Beverly L of 60th _ Single <br /> Famil <br /> isltd said <br /> tase I will be hsub- <br /> divisionstandard <br /> hal bevelopedwiht n of Peck's Dr.tothe <br /> north property line occurring at that time. <br /> Phe ii will have PBD conceptual approval at the time otentative ati <br /> ve <br /> plat approval of Phase i Formal t mshall be <br /> withhethe Planning until <br /> submitted and iby <br /> e Pshall <br /> �YearOftttiVpltarovalh )andalrecreation <br /> improve- <br /> mentstinstalledtafnalaapproval PI. <br /> Phase/II will <br /> ofotentetive plat): of <br /> wIth tentative PRD approval r red withtwoayears <br /> kwhere <br /> t <br /> Evpard <br /> i <br /> Fve,�that the ec's Dine detenshe rn will b turns - - <br /> and will <br /> Y� <br /> Of <br /> con- <br /> struction occurring in Phase I. <br /> sidewalks o both sides,with <br />