Laserfiche WebLink
• <br /> 421 <br /> September 17,1979 <br /> A special meeting of the Everett City <br /> Council was called to order at <br /> 7:30 p.m.September City Hall,President Pro 17,1T h 1 Chem'Michelson ambers of the Everett <br /> . all it <br /> waS found inMoore <br /> attendance,e:-Pt Counenen AldcrOverstreet,who wereee <br /> JADE PARK PLAT HEARING <br /> derry Ervine,of the Planning Department,reported the <br /> consists,BO units,all <br /> Jade <br /> The aapproial for es units, Planning <br /> ecom- <br /> n four <br /> mendingp1df 80 un hwill ion0.98 acres <br /> Thirdcorner of Avenue and103rStreet. w o Souway of Third <br /> Av.endesewill b improved by publclydedi- <br /> cill be <br /> off Third Avenue into the <br /> roject, • <br /> ated a epublicly <br /> four private <br /> landuse is C-1 to the north and RS tote east,sou west. <br /> • <br /> He said the Planning Commission at their <br /> duplexes drequested • <br /> the single family residences,rathei thanthe fourplex. This project would occur in four phases, h <br /> con- <br /> struction Pdo <br /> Che <br /> and in 8 f public <br /> a somedap <br /> plexes <br /> ,specilying <br /> tto habe. d e ofthe oonditions was a fee for the <br /> $250.00,fee blips <br /> ewers <br /> wouhepld benrequir an amount e determined by the Public works <br /> He said the <br /> zoning is R-S,Residential <br /> urban,which requires <br /> uare feet minimum lot size. The <br /> is requesting a re- <br /> zone <br /> to R-2,Single <br /> require <br /> %e square eetYfor single family homes nHigh Density and 7,,500h1 are feetfor , <br /> s. <br /> He Raid <br /> Planningproperty, <br /> hearing there <br /> concernNesingle family rresidentst that thednot ouhe <br /> adjacent to 6. <br /> their Joaannrng Commission <br /> o request or88 units 80 units,and that would <br /> adja- <br /> centese <br /> to <br /> single <br /> hanged the location <br /> of fe family home thee developer <br /> revised atdo [sPeegesupports the 88 units over the 80 of <br /> approves by the In answering <br /> a question by the Council,Mr.Irvine said that the Planning .• <br /> un <br /> its,but did not Commission <br /> of the revised plan and the staff take supe • <br /> meetin <br /> that this <br /> • <br /> heybroucould <br /> theirht to . this,workshop a t public hearing,so <br /> which'included.He reviewed•again u <br /> Third Avenome of the ue <br /> onsadjacent <br /> approved <br /> the t <br /> he Planning COm- • <br /> to <br /> curb,sidewalk on the east side. E1 <br /> from the northwest corner of <br /> the project to Broadway should A ed t y . <br /> complied with during and after <br /> fconstruction,and the applicant ardrainage ordinance would have shall develoPr an active recreation area 1 <br /> schools was one of the <br /> mined by a Public works Department.required in an amount co be aster- <br />