Laserfiche WebLink
183 <br /> April 16,1080 <br /> MOTHER'S DAY CELEBRAT/ON <br /> 'CN:bnt:Zgntg:c2bI'LZ'ITL7':tt'D'hetrnlo:T1=al'a"' <br /> C/TIZENS COMMENTS <br /> ast=r:ZTP4rIMas=eM C-111=17::Itat=." • <br /> 2agTe,,I111,1=.of 4501 Colby,complained of the traffic and speeding <br /> • <br /> LOWELL TRAFFIC REPORT-(CB 804-173) <br /> Ron Cameron reported on the Lowell Study and some of the solutions <br /> aecomplished,. They had marked the crosswalks and signed them,especially <br /> to the park area,relocated 1 speed limit sign and added 5 others,added <br /> buttons,double yellow lines,etc. He said they had met with the Lowell <br /> Com.1111-tY People as far as the solutions umre conCerned. <br /> Chief Peri,of the Police Departmnt,reported the radar car had spent <br /> several days in the area and issued 36 citations with the average spee61 <br /> being 41 miles per hour in a 30 mile zone. The majority of the citations <br /> were for residents of the area. <br /> ., <br /> rn'tno2irart.4"'aa'th raurth' . <br /> RESOLUTION-(CB 804-174) <br /> ::Zutlo=!i113 aZ71):Ws7"aa"a "a""""l'aPa''a a"'t • <br /> A RESOLUTION authorizing the selection of a . • <br /> Transportation Engineering Consultant to perform • <br /> the.P-50 Planning study"authorized by WSDOT. ,• <br /> WHEREAS,the Washington State Department of TranspOrtation(WSDOT) X <br /> has appropriated$15,000 of 62.980 matching funds to complete a report- ' <br /> inventorying specific projects to improve the safety,capacity.nd <br /> energy use on existing Federal Aid roads and streets)and (1), <br /> , <br /> ) <br /> WHEREAS,the information will be useful in preparatiOn of Our TIP <br /> and future prospectus for Federally funded transportation safety, 1 <br /> ualuaCity,and energy improvements;and <br /> WHEREAS,improvement projects constructed with FHWA or IlAB funds on <br /> a Statewide competitive basis will be selected with consideration of <br /> the Statewide P-50 study results;and <br /> WHEREAS,the study requirement for eligible funding reimbursement is <br /> completion of the report by December,1980; <br /> . — <br /> NOW,THEREFORE,BE IT RESOLVED THAT THE TTAFF/C ENGINEER PROCEED WITH <br /> THE P-50 STUDY/NCLUD/NG CONSULTANT SELECTION AND 1.SPONSIB/LITY OF <br /> STUDY COMPLETDON. <br /> ) <br />