Laserfiche WebLink
[T 208 <br /> April 30,1980 <br /> 6. Project would create negative traffic impacts both pedestrian and <br /> vehicular for the resodents of the area. <br /> 7. Dt.has not been demonstrated that there is insufficient land zoned <br /> for multiple family residential use in Everett or that this is the <br /> most appropriate location for additional multiPhe familY resideatiallY <br /> zoned land. <br /> He said these could be found in the packet before the Council which would <br /> be marked as Exhibit A. <br /> He then presented the staff recommendations approvong the rezone with 5 <br /> conditions as follows,which he marked Exhibit 13: <br /> 1. That the following Improvements to public right-of-way take place at <br /> tg„roponentsexpense: <br /> a) Alder Street. A sign indicating"local access only.sbould be <br /> Placed on Alder Street west of Bogg00,3 grigg <br /> b) Elm Street: A traffic diverter is to be placed on the southwest <br /> corr—lerthe intersection of Elm Street and Wood Place. <br /> 4"button or reflectorized markers are to he used to channelize <br /> 'I , traffic north of the intersection of Elm Street and Wood Place. <br /> A sidewalk is to be provided on the west side of Elm,with a <br /> -I. crosswalk provided south of Mukolteo Boulevard across Elm St. <br /> c) 11.102,b12.,a:ceA sidewalk is to be constructed on the north side <br /> I <br /> 14' An asphalt overlay a final width of no less than 22 feet <br /> shall be installed after construction. <br /> j'41 ! d) Dukilteo Boulevard: In order to distinguish the left turn center <br /> lane from eastbound left turn pOCket on the Boulevard,a small <br /> traffic island is to be painted at the end of the left turn <br /> PoCtet. <br /> In addotion thermoplastic stop-bars shall be provided at stop <br /> c : signs at the following locatoons: on Wood Place east of Elm <br /> on Wood Place west of Elm and on Elm south of Mukolteo Blvd. <br /> 2. That the air guality os maontained during the construction phase by <br /> y thoroughly sprinkling the site and planting a ground cover over the <br /> disturbed areas not needed for construction. <br /> 3. That the Storm drainage system Oncludong the temPOrar2 0Y9Aen.479.0 <br /> the construction phase be designed in accordance with the Coty of <br /> Everett Drainage Ordinance. <br /> A tight line with energy dossopator will transport the storm water <br /> from the project site to Pigeon Creek 02. <br /> A system of catch basins will allow solids and cols to be trapped. <br /> The Homeowner's Associatoon must make provosions for the regular <br /> maintenance and cleaning of catch/basins. <br /> 4. That a vegetative buffer a nonimum of 20:in widtn be maintained an <br /> the north,south and east sides of the subject property and berrfted <br /> to a minumum height of 5.. The berm shall be planted with native <br /> vegetation to a sufficient densoty to create a sight obscuring <br /> barrier wothin 5 years. <br /> Any trees to be removed or topped from the area in excess of 308 <br /> slope shall'be reviewed by the Bark aad Planning DePartmeats 10 <br /> determine the condition of the tree or trees involved and the impact <br /> of the cutting on the steep slopes. <br />