My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981/01/28 Council Minutes
>
Council Minutes
>
1981/01/28 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:24:49 AM
Creation date
9/28/2020 10:20:59 PM
Metadata
Fields
Template:
Council Minutes
Date
1/28/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> • January 2B,1991 <br /> ohBy_Sw�x�dk=°° <br /> Joe Rougovsk <br /> eFnslnvski tea the purpose of this workshop todeywaa to hear <br /> • <br /> the <br /> lsolutions to the Colby crosswalk problem in front f Everett <br /> High <br /> Auditorium. firm Skilling, li <br /> Christiansen,Robertson, this a Belle, <br /> be <br /> presenting possiblesolutions costs to tCouncil today. <br /> n Jack <br /> Christiansen exp ihey pursued 4 goalsei <br /> L <br /> , waseparatev ea and pedestriantraffice co1dy, n <br /> • <br /> provide mall-type area for student to provide both vehicular <br /> and pedestrian a to the Auditorium building <br /> frafteo0eaevei <br /> ng <br /> and finally,to provide <br /> problem the l [ <br /> possible co . Bed designs were solution <br /> veloped as follows) <br /> Sour-lane ay.overcroesing, intimated cost <br /> f 5.80,000 <br /> Two-lane oasr estimated cos f$520,000 <br />• <br /> a o z rvestimated cost of$915,00 <br /> 0 <br /> Two-lane runa estimated <br /> cost <br /> 80,000 <br /> E. sada an Bridges(two),atan coat f$545,00 <br /> 0 <br /> i nne'rite': effect on co <br /> eby would al[e <br /> rn <br /> a <br /> try <br /> g ening Department,said.that 3 lanes <br /> are more thanade9 tMr.Christithan <br /> nsen said proposals B wlrequire less utility x- <br /> faand would <br /> provide <br /> He sthat would <br /> £introwhat has been din the downtown He said t <br /> dChe <br /> project <br /> woultake approximately 6-0 monthecompleta.Pedestrianl <br /> be maintained during construction. <br /> Jerry Carroll,of the Engineering Department,said thereave to be is adsiwer line l <br /> C oringwer tch sen au of Colby w w possible drainage problem also. <br /> D were he middle there could whic be a <br /> unclmen Langn was c abou emexteoncy vehicle access eth <br /> Ithere ula be am for care etc pulitover le!Nese vehicles p shle e <br /> �� <br /> 1. Councilman Aldcroft asked without can of co which alternative <br /> recommended from the standpoint of consideration <br /> eta,retc. <br /> said haveoore <br /> .'thoughtyt them School Cittd favored B would honoror1), <br /> fdecisiondecision <br /> a g n would <br /> rom <br /> there. e Y <br /> I', p tenden said the tr. Boar'would <br /> be meeting is coming Monday to dravuea the alterna[ivee of <br /> Councilman c easked ifcouncil (d have <br /> aopportunitytop va <br /> input and President t erpointed out that-Council has not discussed <br /> ed <br /> bhis <br />• yet but would h sopportunity <br /> hsool curs <br /> h their selection wimmediately discuss <br /> this <br /> ck <br /> themselves and withcoBoard. <br /> Upon motionthe meeting adjourned at 2.45 p.m <br /> City Clerk <br /> Read and approved as printed. ai <br /> • <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.