Laserfiche WebLink
38 <br /> January 28,1981 <br /> FIESRAT10N PROJECT-(Ce 811-35) <br /> mary <br /> Haglund,otnhr <br /> ted they had <br /> letter r iauthorization Osborne <br /> Proceed <br /> items the dmo d <br /> ni <br /> On <br /> to 1981atof the in h <br /> is <br /> would continued until neat week en that more detail coetter and,after discussion,President Baker uld be obtained. <br /> • BIDS RECEIVED-Ice 811-36) <br /> reported the following bids had been rete for construction <br /> Mary <br /> of 06: <br /> Venture ons r tion $5,740,850.70 <br /> Humphrey n ac 885,810.89 <br /> Prime ns x ction co. ,258,278.05 <br /> Will ns rut n 316,841.70 <br /> Gall Landau Construction ,491.00 <br /> Remo Co. 6,414,665.40 <br /> Wilcox ns ruction ,289.00 <br /> Tri-State/Meta 6,580,233.90 <br /> Wick rut r n ,066.19 <br /> Constructors Famco 6,870,825.00 <br /> No.:zest on ,437.53 <br /> J.D. <br /> Pease c Sons 7,282,358.00 <br /> Recommendation he construction <br /> rn9 amount of 55t17,40,090.70ttocthe caward lowbidder,v Construction <br /> Companyof Auburn. <br /> B.AWARD <br /> moved by Councilman Pope,seconded by i C uncil that the <br /> contract for construction of Reservoir 06 beawardedtoa low <br /> , Venture tonstruction unit bad off v prices <br /> extendded for Auburn,of basedes ofp$5a740,,8 .70 <br /> a received at therbidsope heldat .00 p. .on January 15,1981,50 <br /> Roll was called with all Councz2men voting Fen:ext p councilman Aldcroft, <br /> ete who was excused. potion carried <br />