My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981/02/18 Council Minutes
>
Council Minutes
>
1981/02/18 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:26:21 AM
Creation date
9/28/2020 10:22:30 PM
Metadata
Fields
Template:
Council Minutes
Date
2/18/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
73 <br /> BID CALL-(CB 812-64) <br /> To'authorize a call for bids for restroom facility at Silver Lake 1 <br /> -Merk.'Bids to be opened at 2:clo p.m.,March 5,1981. <br /> BID CALL-(CB 812,65) <br /> Roll was called on the Consent Agenda items with all Councilmen voting <br /> Y". <br /> Motion Carried <br /> ADA ADDON <br /> M=tLdCgUhaTnma/maObgeNe <br /> egrd=,in onaf;ectgo=hellMi9os:i11too4rn hVs=eevheiacr=alel lDdeaop'as:rtament,re=por1ted:7a tbhue s"ha"d ae <br /> !1!1171.131.11 <br /> aorizeoof service during the normal bid process,Council is requested to <br /> uization of the Transit fleet,and the.extra time the bus woeld be <br /> ygo. DUE to the high <br /> immediate emergency rePairS• <br /> 111 :71 <br /> Declaring an emergenCV to exist,and Authorizing <br /> immediate repair of damaged transit bus 8232 to <br /> 111 provide scheduled service <br /> ig 1.1 and 27fMr=2.%27,114 q"=".!=e=11:=1.2,%7"' <br /> leaving two for"spares%and <br /> 1A.A <br /> WHEREAS,one bus is now out of service with a blown engine and <br /> 0' ! tWO more developed brake problems this morning which may take more than 13'1111! <br /> 00 m www day to repair and restore the runs dropped today for lack of equip- <br /> g ment,and <br /> 56 WHEREAS,Bus A132 was involved in,collision on February 16,1981 <br /> which caused damage that will take twa weeks to repair at a cost of <br /> more than$3,000,and <br /> WHEREAS,it will take a minimum of two weeks before the repairs <br /> 7' can begin if the regular bid call/bid award process is followed,which <br /> m. will mean a month out of service for Bus#232,and <br /> 7' sholzseUrctulC111=t1teLPIlf 1v=k err.:111:LE13eman1e beaY <br />
The URL can be used to link to this page
Your browser does not support the video tag.