My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981/02/18 Council Minutes
>
Council Minutes
>
1981/02/18 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:26:21 AM
Creation date
9/28/2020 10:22:30 PM
Metadata
Fields
Template:
Council Minutes
Date
2/18/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-77 <br /> 9 <br /> February 19,1991yt <br /> all of the tr nnginf Eeer,sy y thisot<lanenothe y Dine handle <br /> • <br /> Councilman Aldcroktheir„felt[ e best s nthe d w s <br /> Boardam cp with share f ot ey urs thatthe choolin <br /> Councilman Langus questioned the safety of the students crossing <br /> and also c<nsader y less amoant of students cloy gtthlsestreet. affrc <br /> Gilman tch1lson shoas he felt uld b traffics if <br /> anything at • <br /> said <br /> so tImt <br /> to thelother sincColby <br /> thea y was founded andad been a through eet from one end f the this should continue. Citing narrower than that was nOt Safe. y <br /> • <br /> • <br /> President Baker asked Mr. <br /> Cushman <br /> e Budget and <br /> rman <br /> solations. o present the findings of theiim <br /> Coittee as to funding Finince <br /> man said <br /> had <br /> et wi.Dr.Fjeran of the Everett School <br /> Districvssues wearon y 2lstmto reach an understanding and thegeneral con- <br /> sensus t. The City and school District will equally share all coats of the • <br /> project on a 50-S0 basis. <br /> P. <br /> sbid process ginspection,fins app approval front-end financin <br /> theg. <br /> 3. The Cishould provide t project funding cash flow and arrange <br /> long-term ting. <br /> 4. The City,through the 1. lOffice,s interlocal <br /> ot 'AY <br /> rer ese was neceeey o ac isM1 the task.aea whatever <br /> paymentHe Said there were A plans to arrange for'financinm one was total <br /> rom existing <br /> or <br /> revenues <br /> payoff payoff£ multi-year <br /> debt f from existing revenues running from to 2 years. • <br /> hat g orl P"""s <br /> • <br /> He said <br /> ated cost of this <br /> vehicular overpass was <br /> $520,000. However,this could change e <br /> change with passing of time,etc. • <br /> • <br /> Bill Dobler,of 4833 cleMavenrevitalize dozmtown Everett a f f all of the <br /> eu <br /> o emphasize <br /> Pedestrian - vehhicular traturs ffic. <br /> suggested <br /> ested <br /> Colby <br /> h basis and then look e ins - <br /> lane stop Everett would pedestrian would <br /> this be the hx y he downtowndpeople <br /> feltHe said just-recently Mayor <br /> and his staff had met with some <br /> downtown <br /> changing w1 adiscussing pattern tbe going. <br /> he heoprcblem of the parking and downtown two-lane traffic pattern <br /> e1 ]0 <br /> on Colby, ith additional parking. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.