My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981/02/25 Council Minutes
>
Council Minutes
>
1981/02/25 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:27:04 AM
Creation date
9/28/2020 10:22:50 PM
Metadata
Fields
Template:
Council Minutes
Date
2/25/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
__ <br /> 79 <br /> • <br />• <br /> • <br /> • <br /> February 25,1981 <br /> • <br /> Tne regular meeting of <br /> ailed t der ate 5 theEverett Bakeresident presiding al <br /> • <br /> co.ciimeniCouncilman was excused,snaCouncilmanacro t,who arrived at m. <br /> • <br /> SW EVERETT SEWER 1./0 WORKSHOP • <br /> clair Olivaers,o public works Department,g a brief update and <br /> whichledsaid the <br /> the and discuss workshoptodayviability of the designicriter a,financing proposals <br /> Bill Norrie - a the background n <br /> the studes N thelate70'ss,gsu s <br /> Southand the S the 2,485 tH <br /> proposed e o 1 individualparcelses b • <br /> y 25 teldie contained <br /> any,John <br /> Fluke,Associated Gravela n t m <br /> City D ;bounded w by C Road on theap south,Glenwoodthe east, eo Blvd. <br /> Heusi preliminary <br /> thepopulation 1£st and h beeb basedon <br /> maximum <br /> a D.to an area above £ae ' <br /> per <br /> would special benefit area Merrill withinthe <br /> e <br /> station and ea ks facility.ents <br /> eP consistingt interceptor,new <br /> r pump <br /> { <br /> work coals scheduling onlvhbe done during summer monthsukilteo beach nadue to the dna <br /> Rim Batt,also of c 1 naddresseed the cost <br /> project. <br /> 28 3 2,000 which i total <br /> 25 inaenc <br /> y,and would <br /> 18 completed 6 190rleif apaco Mukilneo Beach inter- �6 <br /> ceptor could be done d the ssummer months. <br /> 2akr,,r,I.L.rrs then explained the distribution of costs for the project <br /> LID at share 00 <br /> State699000 • <br /> ty SewerOE,Crant 7,259,000 <br /> CitShare Districts Share 2,108,OLD <br /> Bruce Jones,Assistant City Attorney,asked what alternatives the CitY <br /> woul <br /> have if it did not <br /> would-heis at abuild this project,and c,air a <br /> or mea wacepacity le a.even <br /> thougha rr redeclared there <br /> s. <br /> George Mack,of Seattle <br />�.. Sea ef Northwest,said then problem he could <br /> fore- <br /> see <br /> e that the cie to dip into anY <br /> more then nlionccua <br /> Stand in collection of delinquent accounts.to avoid financing problems. <br />:Sp s would a the property Dennis Derickson,of the assessment <br /> a$ t o rty dna <br /> has trior 15a pwhicher square foot, line since • <br /> led in value within the last years. per <br /> property <br />
The URL can be used to link to this page
Your browser does not support the video tag.