Laserfiche WebLink
1 <br /> 283 ; <br /> rl <br /> June=x,1901 <br /> Jim Alg or <br /> needs in said consideration of the <br /> RousinJR <br /> than a 1 erforarea <br /> a relevant <br /> a this <br /> density for the entire <br /> 7,acres. <br /> categ y e saiddeveloper was asking for a rezone into the PAD . <br /> 616.Allendoerfer <br /> ents made by Dr. <br /> regarding the 3 <br /> r of units <br /> comprrehensnsidered also, and[eltntherGrowth Management area as set Plannshouldub carefully <br /> rebuttedHe the statement in regard to the City realizing a <br /> net income Psaying1 $ <br /> itr an <br /> 0-fo00 <br /> increase of Fire and Police h philosophydisagreed with the p e <br /> of density being controlledhe market <br /> He pointed out the <br /> a Plans <br /> a proposals an not on proposal before Council this time. <br /> Allendeerfer felt the traffic experts had failed to take 1 <br /> sideration thecon-is already constructed on tlmse roads leading into this comparisons presented of other developments <br /> in �whossaid oriittyltalked <br /> had someone <br /> urer - <br /> the credibility of this eloper. access read an questioned <br /> In regards s by Mr.Markley whoi the lots needed for the <br /> connecting link were <br /> not <br /> developer's <br /> acquire <br /> spertnat withthe <br /> nhe spoken n Cameron <br /> who said rt was Shadow nn that would cause he need or an -westlinli <br /> • <br /> are:altnonb prseaasha taa I'M' <br /> f <br /> u roe the r <br /> one <br /> A <br /> lloethatDepartment <br /> agree with the <br /> no recommendations <br /> in the dloper original proposal lasen as many as 13 Vothen. anthel ngfor12dwellingu said e A, <br /> ' <br /> developer first started <br /> out <br /> with <br /> acre. <br /> itis <br /> just for Sector A and pointed further public hearings <br /> On Sector A if approved,just staff meetings.hearings on the There <br /> be public <br /> remaining density <br /> locked in and felt the density or was uha key re <br /> certainHe felt areas h suand Policech <br /> Depart- <br /> =VA h considering Ii eand staff <br /> redraft his <br /> more time.y shoo at t process <br /> ave always been required when <br /> He said the PRD proPosal <br /> s a compromise and it was unfair to <br /> He <br /> eels <br /> 11 <br /> Mr.Allendoerfer referenced remarks by <br /> Tanis Marsh,Planning C mmisraon <br /> member,regarding -nter,...etation of the Halprin Planinto writing and askedithat toils be made a matter of recordWhich w put <br /> 4 <br />