My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981/08/26 Council Minutes
>
Council Minutes
>
1981/08/26 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:35:31 AM
Creation date
9/28/2020 10:35:04 PM
Metadata
Fields
Template:
Council Minutes
Date
8/26/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
410 <br /> tt <br />( August 26,1981 <br /> ,_y =4V,0 deed ae a ILOmalemen tate.nereaee ewer e <br />, Mayor Moore said the cost of cleaning a septic tank usually required only <br /> I ' every 3 years or so was msndmal and pointed out the cdtdsens of Everett <br /> 11 ware PaVdng el/proximately CM..Per Year for Sewer service. tie sada <br /> he felt the citIsens were being asked to pay for subsidisIng this and that <br /> by 1984 the lagooh will need dredgdng an reaching <br /> the .11ity of the <br /> be <br />' looking at a major expenditure. <br /> Roll eCall: dchelson,Langus,Gypson,Overstreet,Baker <br /> Nays; None <br />�.1 Excused. Pope,Aldcroft <br /> li Ordnance No.001.07 Adopted. <br /> 1 Bou Ail Breet was excused from them .n9 t th e time. <br /> ID <br /> 18-3471 <br /> 1' Moved by Councrlman Michelson,Publ seconded b street construction of Everett Mall Way L.I.D.X1 (Works DepartMent South <br /> Sthe ue trace <br /> 705 <br /> awarded to the low bidder,Ben Holt Construction extended ted total <br /> 51,,pro182a ,101.90osal and uas received uat topening held at 2:00 1pam.,August 13,141 <br /> was called with all CouncIlmen voting yes,except <br />{f Aldccounc.lmea roft and owe=street,who were excused. Carried <br /> Pope, <br /> lli eros RECEIVED WB 818-359)f the Public Works Department,reported try following 5 <br /> were received ofor the sewer lagoon dike maintenance: <br /> Builders Hilltop Metropoldtan G.Stoen Graham <br /> Distributors - con- - <br /> Sand ruc v uc ao P a ru <br /> xc n <br /> "2:=11'5 <br /> 42,900 00 St6,450^00 St0 052.00 5'3.:M..°8'5' <br /> .00 500 <br /> 5 ST <br /> $50,438.00 5 65,159.85 503,062.65 Ery 75,236.85 5T5 06,069.00 <br /> 1. <br /> I Recommendation is to award the contract to the lowest...most responSiVe <br /> 1' , bidder,Builders Distributors Sand 6 Gravel,Inc. <br /> i. <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.