Laserfiche WebLink
449 <br /> September-x3,1981 <br /> 3. Monte Cristo Hotel rehabilitation <br /> 4. Public safety and transient program <br /> • <br /> surer.was a <br /> could extend to-range dountorm planning s y in the works which <br /> pat McClain,from Administration,then briefly <br /> downtown transit terminal study. He said they are waiting approval <br /> from <br /> t Sound Council of Governments regarding amendments and <br /> also ee0/0,000 for a study of the transit needs in downtown • <br /> actualEverett. The c _ •• <br /> grant by UMTA with construction targeted r toull,tte ,by • <br /> f • <br /> yp of1983. y s to be constructed.Councilman tudy would decide where iron would <br /> ft asked when the funds <br /> would <br /> Mr.McClain replied ben g <br /> had City received.the City fur the$10,000,,verbal dbut as of this deno letter of approval <br /> • <br /> Roberta Goodnow reported on <br /> She said e taff from ethenMa nning <br /> • <br /> n[. <br /> redevelopmentDepartment had been meeting with the owner's agent,Vern Grandberg, • <br /> concerning <br /> owner and Mr.Grandberg are currnntly working to redevelop the <br /> Monte Cristo into <br /> senior <br /> thefor <br /> these condominium <br /> xhe or the pas <br /> restaurant, g <br /> requirements of <br /> t- <br /> hh a hearing on <br /> variance pally scheduled by t <br /> 14th o <br /> October be <br /> ay ° Planwill <br /> federal or state subsidies,gr r loans. <br /> seekn <br /> reHsaid on June 4th,merchants and business <br /> people in the vicinity <br /> Rockefellerf ewitt and Rockefeller formed the Square t <br /> Group. For the past several months this phasb <br /> weekly to lte, re- <br /> d with the <br /> ores parking <br /> zones on HeWitt ad Rockefeller no longer needed to allow more • <br /> on-street parking. They are also working on solutions to transient <br /> prOblcns with staff from the Legal Department. The Rockefeller <br /> Square Group is also working to have e litter c <br /> and to construe planter boxes in front of several businesses. <br /> 6..Derickson then reviewed the project scope of the proposed • <br /> revisions to Colby Avenue as fo ows.1. <br /> Conversion of <br /> o omeither <br /> 19th 5 - arterial corridor with <br /> angle parking <br /> blockaces. • <br /> 2. and/or right or added at <br /> o intersections 140 n o expedite <br /> traffic flow <br /> 1• tel <br /> parking stalls would be added as a <br /> result of the revisions. <br /> • <br /> c estion and prove Pedestrian access and sa y tersection <br /> gr <br />