Laserfiche WebLink
• <br /> 561 P <br /> • <br /> October 28,1981 <br /> 9105 RECEIVED-(CB 8110-455) <br /> The following s were 70088 the 3800 6 ewer and alley <br /> pvement,W.O.#1524,L.I.D.# <br /> Roy Shong 5 48,966.70 <br /> Everett Construction Company 58,580.0D <br /> Land an Company •59,045.00 <br /> ConstructionPany67,726.75 <br /> Ben Holt Construction Inc. 72,351.25 <br /> • <br /> It yrshrecommended <br /> ng Construction Inc.hat in the amount contractward this 566.the <br /> e low bidder, <br /> . BID AWARD <br /> . Moved by Co• concur in uncilman <br /> hathtalley improvement rd <br /> shong eds Department and <br /> tthyConstruction based <br /> proposal and t bid of prices ttotal <br /> f 548,966.70,areceived at the opening held at <br /> 2.00 P.m., <br /> October 16,1981. <br /> Roll was called with all Councilmen voting yes. <br /> Motion Carried <br /> Councilman Aldcroft left the meeting at this time. <br /> CONSENT AGENDA ITEMS <br /> Moved by Councilman Gipsrm,seconded by Councilman Overstreet,to <br /> adopt the following Consent Agenda Items) <br /> WATERLINE EASEMENTACCEPTED-(CB 8110-450) • <br /> To accept eaSement from Burlington Northern Inc.for <br /> • <br /> pipeline survey station 1893+32-Male Past 33.756" water <br /> RELEASE D-)Ce 8110-451) <br /> To authorize the Mayor to sign a release from Burlington Northern, <br />