My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981/11/04 Council Minutes
>
Council Minutes
>
1981/11/04 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:33:05 AM
Creation date
9/28/2020 10:39:00 PM
Metadata
Fields
Template:
Council Minutes
Date
11/4/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
505 <br /> • <br /> November 4,1991 <br /> • <br /> president Baker announced that <br /> Mary <br /> Haglund of the Engineering De <br /> was e <br /> at an add-on to the agenda.ept. <br /> • <br /> MULT/PURPOSE DEVELOPMENT <br /> THE <br /> ACT <br /> b..Haglund d that FERC had approovedEtheRjointElic <br /> for the PUD Project which becomes effectivewithin 3 application <br /> either licensee appeals. Hecasked to review unless <br /> they authorizeethe Mayor with <br /> c y next requested <br /> ytbecause n ncnydt sign <br /> 'Tlemjcar=e4°Ivag=sementfbeforahePublic mt Y ro aeovtd be given re ins <br /> of the city. affected the citizens <br /> Parker Williams,representing the ,had no problem w ertising <br /> the proposeay s contract. <br /> Hee suugestedOhowever otthat athe council-areview <br /> with prior to n week's session. <br /> to be y p Y ca 1 dealt <br /> aglua thenpointedo the areasof te contract that <br /> had been negotiated over auperi d of weeks. <br /> ars to Water Quality t Precedence0Supply <br /> to have Precedence. to <br /> Overstreet a feArticle.2,[M s <br /> requirements"water o i ve Ph referred <br /> over eencs <br /> requiremeno f said ew to requirement of225tothe nyear <br /> 2020.. asked what happened ta r 2020. Haglund replied he <br /> fwas est,as did <br /> Grayction to <br /> nd Osborne,beyond the 2020nbutntherethat <br /> wa theth25gxin <br /> thereswas a section later an thew leis wt a be ng orb arctic <br /> contract regarding led exctfon. <br /> Councilman Gipson objected tb PUD not participating in the incre- <br /> mental <br /> costs required by operation of eitherFiltration Plant o <br /> the Permanent'Emergency <br /> a Tr atment..Facility until waters were in <br /> excof 2ONTUexpreaeed in xrtiav e to raise the dele I said • <br /> these Pip p euggestd t rates Hin order totakeca <br /> of this <br /> >n the osis. he PUD could the e d participate <br /> re <br /> Williams felt this section showed the PUD wanted tr share fairly <br /> in e •costs but not be <br /> increase <br /> • <br /> their rates, r lestance�Nldhelp pay lfbrlthe emtal for monthe keeping <br /> the city's water clean. <br /> • <br /> Councilman Michelson left the meeting at this time. <br /> Haglund then pointed o s 1,2 s 3 of Article VI <br /> thebalanceo tageOI payments water cost includedrin <br /> Sultan Project an joint coats f Sul Project. <br /> Vfvvvt <br /> Io Att..,pointed <br /> out this contract stat. <br /> city will echarge rates for filtration paiate from the basic water <br /> rate which s ars a filtration rate will not include a surcharge to <br /> customers outst <br /> idethe city. <br />
The URL can be used to link to this page
Your browser does not support the video tag.