Laserfiche WebLink
77 c <br /> February 24,1802 <br /> COUNCIL NO.ezz-es <br />• <br /> g a Mhcs�aasigaee <br /> bidding on oinon behalfof the City of Eve mpetitive <br /> we <br />• SECOND READING; <br /> r tghe 40tF va he alley <br /> east of Colbypr 39 thist ec t street. <br /> The meeting then recessed until 4:30 p.m.for xecutive Session. <br /> The Ri Session <br /> whichthen <br /> session,with apresiding d <br /> na allcouncilmen in attendance. <br /> nt <br /> • <br /> CHANGE ORDER,(CB 822-78) <br /> N ooote Rb1Natme ""aa"'t <br /> concrete c1etwelln • <br /> ge <br /> (reservoir) [ irather than a5milliongallon i1 clwe <br /> enance and operation . <br /> costs in <br /> change order approximately <br /> $15,000engineering <br /> costs. He explained tIwt the • <br /> original <br /> included million for ue< 'aligln edof <br /> nsilo alllo e perrecommnationgallon° engineeringaalyis. <br /> Coun <br /> a ccilmaann Michelson objected to the additional$15,000 for a <br /> 2=rete iia na.e isee maintenan problems thd"aan the <br /> Bruce <br /> c sal thatt neve stated <br /> project had to be <br /> approved by them. The sq changes <br /> o <br /> staf a ,oaawisnio proeeeerw, is, f posaihle. a rt. <br /> Bill ted they have not yet arranged for <br /> financing a has t,of the also tahad an opportunitY to di...with <br /> D whether this is,in fact,a substantial Change. <br /> Houwver,.e felt this change would only benefit the City of Everett <br /> in the long term. It tin <br /> Change, .n <br /> thus ecessitag e a substantial <br /> UD Commission approval. <br /> Councilma <br /> clearwellnwhibh was pp y all tote adequate and acceptable. • <br />