My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982/03/17 Council Minutes
>
Council Minutes
>
1982/03/17 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:36:43 AM
Creation date
9/28/2020 10:46:11 PM
Metadata
Fields
Template:
Council Minutes
Date
3/17/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
101 <br /> • <br /> March 17,1982 <br /> • <br /> RESOLUTION-(CH.823-107) <br /> moved by Councilman dseconded by oucilmen Lang.,to pt <br /> Resolution No.2065 asfollows <br /> • <br /> accepting the Port <br /> RESOLUTION <br /> $100,000recommendofC ofraock approximately <br /> dner ds <br /> specifying s <br /> m maade; authorizing <br /> the preparation of a Plans and <br /> and Summer of 1982. <br /> construction and project implementation inithe Spring <br /> WHEREAS,the City Council has <br />,- aci i i n livability e t Gan r are andimproveneed to• public <br /> WHEREAS, <br /> on Tanuary o ,1982,t City Council <br /> c 1 authorized approximately <br /> $66,000.00 <br /> Drovements <br /> J in the Port Gardder area as evelopment of the y ofEverett s 1992 Community <br /> Developmentc an application:and <br /> un sain r m e y 804,01981 i raei <br /> n c esttd <br /> 982,residents <br /> thPort Gardner <br /> on' • °s ighborhood-wide lmeet ng at whrchfresidentsGVoted on nproposedood <br /> PrOje <br /> veNOW,THEREFOa <br /> IRE'be it resolve y the city Council of the City of <br /> j. E <br /> The following projects <br /> a ed by P n , <br /> ,he e <br /> implemented <br /> constructed with the <br /> approximately1000 <br /> through the o 0Program. <br /> (The project <br /> received elisted received the next greatest number of <br /> uld votes as c). <br /> . <br /> rev <br /> e s ramps/nstall eight wheelchair Pacific and Norton Avenue • <br /> cion. a cost,01,60000 <br /> 2. <br /> eight w s me <br /> • <br /> and 32nd Street <br /> intersection. Estimated $1,600.00 <br /> • 3. Allocate <br /> $3,000.00 to Council for a Greater <br /> neighborhood <br /> community organizing work on , <br /> a. ow In 4 07,000.00come for homeowners. insulation ana weacheratripp 3 <br /> ences. <br /> • <br /> • <br /> 5. Complete s i a cost:°05,000.00of historic properties in Port Gardner. <br /> • <br /> • 6 <br /> 00001,1030003.n s imatea cos.a 00,300.00ghout the <br /> 7. Construct new curb,gutter,and sidewalk <br /> n bo dW0b1°ck o [e to sides allow parking a g <br /> d <br /> e side of the <br /> block. ma cost:$54,000.00 <br /> B. thealth ph,p <br /> ys Park to Jackson <br /> • Playfield. Estimated cost51512,000.00• <br /> • <br /> "' 9. Neighborhood traffic study. Estimate t. $5,000.00 • <br /> 1`= • <br />
The URL can be used to link to this page
Your browser does not support the video tag.