My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982/09/15 Council Minutes
>
Council Minutes
>
1982/09/15 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:45:42 AM
Creation date
9/28/2020 10:55:25 PM
Metadata
Fields
Template:
Council Minutes
Date
9/15/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
357 <br /> September 15,1982 <br /> I <br /> raft asked Bill Cushman,Finance Director,about the <br /> asaofmfntheaEvergreenMay Fun was and he replied the balance <br /> the farste£the year wasd5560,000 plus accrued interest. <br /> Mayor Mooix reported h 1 with the Evergreen Way organization <br /> arc they h indicated d hadnoplans of ff theek d velopment <br /> tion <br /> hia fund for this <br /> project. Tand hey Theywere aware of indicatedhtheyhwere satisfied with what 18 icing done <br /> on Evergreen way. <br /> Bat Earns,of the Reininga Corporation,reported they are in the <br /> reviewed thcess of elLIDlcostsase II of fMe and.are In generalct.egreementsaid <br /> withSthehave <br /> osts t <br /> as proposed. i 1 <br /> Councilman Stephenasked Ron Cameronif he felt there might b E <br /> problems relative tonthe intersection at Evergreen Way,and Mr,S ^ <br /> d he did not foresee it creating a additional hard- j` <br /> shipps to traffic is patterns along evergreen Way.y. Et <br /> Councilman Stephenson theasked Mr.Came there would be a <br /> n lane a replied <br /> S <br /> t us <br /> would be a flA.5,W.lane <br /> on�Eve g ac-io h treetd Caampus Parkway With i ' <br /> separatea signal. <br /> Preside. <br /> Pepe asked if anyone else wished to speak and no one <br /> replied. <br /> , Moved by Councilman Aldcroft,seconded by Councilman Michelson,to <br /> continue <br /> e public hearingl <br /> unti p <br /> 0 m.,September 22,1902, #1 <br /> andnd have third afinal reading of the ordinance at that time. <br /> Roll was called with all Councilmen voting yea. 'pC <br /> Motion Carried <br /> VAGUEEERTMG REPORT-OLID$1-ICE 829-3941 I <br /> Al Theel,Director of Public Works,reported that,after evaluation 5 1 <br /> of the value engineering repo on the W Everett taw Interceptor .F <br /> p�A1nSC 2M Hill was instructed to provide their analysisandnow <br /> pec dations£or proceeding with the,project. CH2MH1 has n <br /> done this. Public sting the following: 1 <br /> 1. sthe Public Works wDir Boor be authorized to direct CH Rillto proceed <br /> with the valueengineering recommendations as p their <br /> le f 8-3-82; <br /> 2 That the y assume risk of relaxing the act 1 0 zssur <br /> rize the <br /> on the Public works Southend <br /> rct sigor nraeper hold harmless will of subject <br /> to approval of he city oAttorney,relieving CH. <br /> responsibility for this <br /> change; <br /> Request approval in writing o08 from to revise pans and specs ., <br /> Hill's proposal d follow the project schedule dated <br /> 9e13-82Mprepared by the Public Forks Department,which calls for <br /> the City to advertise forbids by October 20,1902. <br /> with W ked t <br /> t2"notr considered at this,as a result of a ctlme asent tthere is with a ethee possibility thatit <br /> therelmig taberoved avn edyforSA2LSwhichAthe City willknow in approxi- § <br /> ma y 30hday, • <br />
The URL can be used to link to this page
Your browser does not support the video tag.