My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983/08/31 Council Minutes
>
Council Minutes
>
1983/08/31 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:58:15 AM
Creation date
9/28/2020 11:11:35 PM
Metadata
Fields
Template:
Council Minutes
Date
8/31/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
324 <br /> August 31,1983 <br /> I BIOS RECEIVED <br /> 2 7The f owing bids were received for miscellaneous tools for the <br /> G fvlkxatvov plant: _ <br /> C GROUP R1 ITEM(S) HARDWARE <br /> - Pullers/Hoists $2,100.22 RETT G$2,685.64L8 al Partial <br /> [ II- Press/Crane 10,355.00 10447.91 <br /> Miscellaneous 1,200.00 .1,392.15 " • <br /> Ayr Tools 1,783.50 2,349.83 <br /> Electric Toole 5,257.47 6.244.14 • <br /> - Measuring Tools 8,462.44 o Bid " <br /> VII tting /Earning No Bid No Bid No Bid No Bid <br /> IV <br /> .4" Recommendation is to award the bide co the lowest and most responsive <br /> bidders,Everett Industrial Supply and Greenshields Industrial Supply. <br /> BID AWARD <br /> I!7 1 a by Councilman Overs seconded by Councilman sStephenson,t <br /> yip he bide for groupsI, and V Industrial <br /> 9 t r 518,902.63 s sales tax,,and award the vbid tfor Group II to <br /> APV I F <br /> Greenshields Industrial Supply for$0,14].91 plus sales tax. <br /> ��'��'i '; wascalled with all Councilmen voting yes,except Councilman Gipson <br /> 11 sea. <br /> who was exon Motion Carried <br /> 1 <br /> tfn J 111 RESOLUTION-LO BARD BRIDGE REPAIR <br /> ;71! oved be C nciolmac etephaneon,recon ed by Councilman Overstreet, o <br /> LEIi'[ I, adopt x soluty 232 ae fclows:d <br /> RESOLUTION amending BOTH the 1983 1988 and <br /> "7"7,1i l li, the 1384-1989 Transportation Improvement Plane <br /> IRI t include necessary repair of he failed <br /> ;,.1t; Lombard Bridge Deck. <br /> g{ RB02 to elvgvble Eo i riaz9e a tate Et,:7M IeMM)must <br /> P l f bedlisted In thedAd,uai TIP:and Bo a iunei s naa any room <br /> `� i an r ce <br /> 7,74,'; WHEREAS,design and Construction funds may he available in 1983 or Ig 1904;and <br /> ,4r� ; l fun closure of the Lombard Bridge required repairs eligible for <br /> R and <br /> I ,k thad bm BEREFORE,QBE T RESOLVED de et r verve t <br /> t both the 1983-1988 and the 1984-198g Tran ofo B City C ent <br /> 6,,' Plane are revisedto <br /> to <br /> the design and repaireaoE the Lombard <br /> initially estimatedoat$250,000. <br /> p, Roll wee <br /> lea with all councilmen voting yes,except Councilman Gipson <br /> ' who was excused. Motion carries <br /> [ <br /> '51471ht <br />
The URL can be used to link to this page
Your browser does not support the video tag.