|
179 ..:.uj 4a1'.
<br /> April 25,1989
<br /> B.RECEIVED-SERVICE
<br /> mesorloveki reported thefollowingo6inREMODEL
<br /> were received for remodel of
<br /> Ne City's Service Center: -
<br /> Williams 6 Hanson
<br /> Abbott Newland Norge Federal
<br /> ..$259,000 $299,634 $310,044 $329,000 $345,231
<br /> Alt.1 is Purchasing [
<br /> Dept, 30,600 30,2002B 71, 6 31,500 40,]3]
<br /> Alt.5 r
<br /> Room 57,000 54,150 46,224 67,000 67,204
<br /> wen 27,035 29,950 30,029 33,345 35,347
<br /> total $373,635 9413,934 $415,013 1460,845 1480,519
<br /> Recommendation is to award the contract to the low binder,Williams 6
<br /> Mbot,
<br /> 1'
<br /> ROAM.
<br /> Moved by Councilman Overstreet,seconded b Councilman Pops,that the }
<br /> for b Remodel be awarded to low bidder,
<br /> will)259,000,6Abbott plus Alt.1,$$30,6600,Iand Art.td,$1 f basic b F
<br /> 095373,635.00 as received at the bid opening held at 2.00 p.m.,Apr11 10,
<br /> 1984.
<br /> Roll was called with all Councilmen votingCouncilman E V I'
<br /> '-,';:'•
<br /> Wit was excused. Yea,except C angus,
<br /> Motion Carriedl0
<br /> 4306 RECEIVED FIRE HOSE 1
<br /> Chief Doug MCNal reported complete bids 2 partial bidswe
<br /> received Or purchase o£ fire e
<br /> hose. ad
<br /> Washington Belt,
<br /> sclso ere esubmitted a lid with an obvious error,which was then withdrawn.a
<br /> 'bends are as follows: 7''
<br /> _em it Item 52 Item 63 _tem 14 'M
<br /> 500 22,00' 50'
<br /> 1-3/4a Fire 21/2 Fire 3 0ire 4-1/2•
<br /> Hose
<br /> Hose
<br /> Hose
<br /> SuctionHose
<br /> Casco re Equipment 1.36 1.80 2.64 14.30
<br /> Corp. 1,224.00 3,870.00 5,280.00 715.00
<br /> Washington Belt as 1.44 14.84
<br /> 1,299.8] 4,132.36 e/0 2.]3 741.04
<br /> 2,959.]5
<br /> McPherson supply 1.23 1.00 30.9498 13.50
<br /> 091
<br /> 0 3,831.30 , 675.00
<br /> MS.Barley No did 1.75 2.51 No Bid
<br /> 3,762.50 5,020.00
<br /> "(Withdrew bis aoe to error on Item 3)
<br /> Mr
<br />
|