Laserfiche WebLink
179 ..:.uj 4a1'. <br /> April 25,1989 <br /> B.RECEIVED-SERVICE <br /> mesorloveki reported thefollowingo6inREMODEL <br /> were received for remodel of <br /> Ne City's Service Center: - <br /> Williams 6 Hanson <br /> Abbott Newland Norge Federal <br /> ..$259,000 $299,634 $310,044 $329,000 $345,231 <br /> Alt.1 is Purchasing [ <br /> Dept, 30,600 30,2002B 71, 6 31,500 40,]3] <br /> Alt.5 r <br /> Room 57,000 54,150 46,224 67,000 67,204 <br /> wen 27,035 29,950 30,029 33,345 35,347 <br /> total $373,635 9413,934 $415,013 1460,845 1480,519 <br /> Recommendation is to award the contract to the low binder,Williams 6 <br /> Mbot, <br /> 1' <br /> ROAM. <br /> Moved by Councilman Overstreet,seconded b Councilman Pops,that the } <br /> for b Remodel be awarded to low bidder, <br /> will)259,000,6Abbott plus Alt.1,$$30,6600,Iand Art.td,$1 f basic b F <br /> 095373,635.00 as received at the bid opening held at 2.00 p.m.,Apr11 10, <br /> 1984. <br /> Roll was called with all Councilmen votingCouncilman E V I' <br /> '-,';:'• <br /> Wit was excused. Yea,except C angus, <br /> Motion Carriedl0 <br /> 4306 RECEIVED FIRE HOSE 1 <br /> Chief Doug MCNal reported complete bids 2 partial bidswe <br /> received Or purchase o£ fire e <br /> hose. ad <br /> Washington Belt, <br /> sclso ere esubmitted a lid with an obvious error,which was then withdrawn.a <br /> 'bends are as follows: 7'' <br /> _em it Item 52 Item 63 _tem 14 'M <br /> 500 22,00' 50' <br /> 1-3/4a Fire 21/2 Fire 3 0ire 4-1/2• <br /> Hose <br /> Hose <br /> Hose <br /> SuctionHose <br /> Casco re Equipment 1.36 1.80 2.64 14.30 <br /> Corp. 1,224.00 3,870.00 5,280.00 715.00 <br /> Washington Belt as 1.44 14.84 <br /> 1,299.8] 4,132.36 e/0 2.]3 741.04 <br /> 2,959.]5 <br /> McPherson supply 1.23 1.00 30.9498 13.50 <br /> 091 <br /> 0 3,831.30 , 675.00 <br /> MS.Barley No did 1.75 2.51 No Bid <br /> 3,762.50 5,020.00 <br /> "(Withdrew bis aoe to error on Item 3) <br /> Mr <br />